1 / 14

2025 Partisol Sequential Sampler

2025 Partisol Sequential Sampler. Deborah Bowe Thermo Electron Corporation. 2025 Verification & Routine Maintenance. Verification Ambient air temperature Filter temperature Ambient pressure External leak check Internal leak check Flow rate. 2025 Verification & Routine Maintenance.

zody
Télécharger la présentation

2025 Partisol Sequential Sampler

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2025 Partisol Sequential Sampler Deborah Bowe Thermo Electron Corporation

  2. 2025 Verification & Routine Maintenance • Verification • Ambient air temperature • Filter temperature • Ambient pressure • External leak check • Internal leak check • Flow rate

  3. 2025 Verification & Routine Maintenance • Routine Maintenance • Filter cassettes: inspect damage or contamination • Filter cassette magazines: Generally not necessary to clean, but if damaged certain parts can be replaced • WINS impactor: In accordance with USEPA guidelines for PM2.5 • VSCC: In accordance with U.S. EPA guidelines • External leak check: Every 4 weeks of use • PM10 Inlet: Every 14 days of use

  4. 2025 Verification & Routine Maintenance • Routine Maintenance • Particle trap filter: inspect 6 months, replace as needed • V seals: Check and clean as needed • Rainhoods: Clean air screens 6 months • Batteries: Check every 6 months replace as needed • Pump: Check every 6 months and rebuild; needed average lifetime is 12 to 18 months

  5. 2025 Plumbing Diagram

  6. 2025 Backup Battery Check • Measure across 188_VBAT & PGND • Drops below 4.2VDC replace batteries

  7. 2025 Pump Check Pressure Check: Quality Pump should give 40 psi on the exhaust

  8. Partisol 2000 Single Channel FRM Sampler Deborah Bowe Thermo Electron Corporation

  9. 2000 FRM Audit Screen Ambient temperature + 2 °C Filter temperature + 2 °C Ambient pressure + 10 mmHg

  10. 2000 FRM External Leak CheckManual method • Record reading on gauge 30 seconds after pump valve is closed • Should not drop more than 8.5 inHg in 30 seconds. Corresponds to 80ml/min rate

  11. 2000 FRM External Leak CheckSemi Automatic • Tolerance is 5” in 60 seconds

  12. 2000 FRM Internal Leak Check • Manual: 8.5”Hg in 30 seconds • Semi-automatic: 9.3”Hg in 30 seconds

  13. Flow Schematic

  14. 2000 FRM Flow Audit Streamline Pro, FTS or Bios flow meter + 5% tolerance

More Related