WECC CEP Update

WECC CEP Update. WIRAB July 9, 2007. Registration. Registrations Submitted to NERC 525+ Disputes Approximately 30 LSE / DP under 100 KV “Parking Lot” October time frame to further evaluate. Update on Compliance Violations. Pre June 18 th Violations 2900 Open Violations

abia
Télécharger la présentation

WECC CEP Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WECC CEP Update WIRAB July 9, 2007

  2. Registration • Registrations Submitted to NERC • 525+ • Disputes • Approximately 30 • LSE / DP under 100 KV • “Parking Lot” • October time frame to further evaluate

  3. Update on Compliance Violations • Pre June 18th Violations • 2900 Open Violations • 2600 Self-Reported • From 175 entities • Post June 18th Violations • 350 Self Reported • From 35 entities • QF Violations • Between June 18th and June 25th • Considered non-sanction able violations • (QF Order was effective on June 25th) • Accounts for 106 of the 350 violations • NERC is reporting violations to FERC • Work load is much higher than expected • Note: some values above are estimated as data entry continues

  4. Update on Mitigation Plans • Most Self-Reported violations have come with Mitigation Plans • Approval process moving forward • Currently working on plans submitted in the June 15 to June 18 time frame • High percentage are being approved • Lengthy mitigation time frame causing most rejections

  5. WECC Compliance Department Staffing • Two Compliance Engineers have started in the last month • Will fill the two 2008 Compliance Engineer positions in 2007 if we can find the right candidates • Estimates of staffing needed to process violations and mitigation plans is probably underestimated • Both NERC and FERC have indicated the regions are understaffed • NERC and FERC are also understaffed

  6. WECC Compliance Department Staffing • RE Staffing Comparison • Data from earlier this year

  7. Proposed Transmission Projects

  8. Proposed Transmission Projects (some projects have alternative routes not shown on map) MT-AB intertie John Day- McNary Northern Lights Northwestern AMPS Seabreeze Northern Tier N. CA to Canada TOT 3 Frontier Line Miracle Mile-Ault TransWestExpress Robinson Summit- Harry Allen High Plains Express Navajo Transmission Project TransBay Colorado-New Mexico Interconnection Project Tehachapi Palo Verde – Devers II Green Path Sun Zia Sunrise Powerlink Tucson-Nogales)

  9. Pacificorp 400-3,000 MW Proposed Mega Transmission Projects N. CA to Canada Up to 3,000 MW 2013 2014

  10. Northern Lights Projects

  11. Frontier Line

  12. TransWest Express

  13. SunZia Southwest Project

  14. Energy Zones Tot 3 Expansion Project EPTP NNMI HIGH PLAINS EXPRESS Albuquerque SunZia WYOMING Wyoming Generation High Plains Express (and Southwest Regional Projects) Dave Johnston LRS Pawnee/ Story COLORADO Midway Limon Comanche Lamar Holcomb ARIZONA Gladstone NEW MEXICO Phoenix Socorro Tucson

  15. Northern California to Canada

  16. Pacificorp/ Northern Tier