1 / 12

Welcome to Yangon: A Superhero Animation Series

Welcome to Yangon is a vibrant 2D animated series that blends anime style with mystical elements. Set in a corrupt city ruled by villains, a group of wealthy high school students unite to form a superhero team to combat crime and restore justice. Their journey involves battling dark magic and mysterious creatures that threaten their community. The series will feature dynamic character animations, engaging story arcs, and stunning visuals, designed for a 1:30 minute opening video that captivates and entertains.

alexa
Télécharger la présentation

Welcome to Yangon: A Superhero Animation Series

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IEP301: INTERACTIVE ENTERTAINMENT PROJECT DESIGN& PRE-PRODUCTION ASSESSMENT 1 PITCH ChiratSrigatesook (YarzarZaw) syd100853

  2. Introduction • Create something different- easier to make • Visually appealing and colorful Presents: • WELCOME TO YANGON Overview of Project • 2D Animation (with help of 3D animation) • Anime (cartoon) series intro opening video (with music) • 1:30 minutes or less

  3. Story • In the city of Yangon, in a 3rd world country corrupted and ruled by greedy rich villains, criminals and gang leaders fill the streets terrorising normal citizens. Several wealthy High school students join up to create a superhero team to stop crime and work their way up to the corrupted villain government that rules the country. • Myanmar being a heavily religious, magical and mysterious country, has more than just average criminals. Besides guns, brute force and technology, criminals and gangsters also use dark magic and mystical creatures to overpower the city. • Summary of the story/arc • Introduction to characters and enemies of the series • Small fight clips of every character to show their skills and powers.

  4. Key Features • 2D Animation using photoshop • Focusing on the animation of characters • No voices or lip-syncing

  5. Background • Team- ChiratSrigatesook • Work Breakdown • 3D animation (Maya) • Using one basic rigged model • Animate models (corrections and timings) • Add good camera angles and camera movement • Render • 2D animation (Photoshop/Flash) • Draw over 3D renders • Adding in details and color for each character • Effects (After Effects) • Add in motion blurs, and shiny visual effects

  6. Work Breakdown Structure • Researching- Idea, Inspiration, Techniques • Music • Storyboarding (Camera Angles, Animation plans, Character position) • Make or find Basic 3D human structure model (with good rigs, skinned, with good controls) • Animate models and camera angles to match with music. • Simple render

  7. Genre/ Style • Hand drawn and colored frame by frame (Photoshop/Flash) • 2D Animation • 2D Japanese Anime Genre Platform and Delivery Medium • TV Cartoon Series or movies • H264 Format 720p

  8. Concept work

  9. Similar Project Examples

  10. Similar Project Examples

More Related