Porlock Sewage Treatment Plant. Site data. Located in Exmoor National Park, with nearby bathing beach 3800 population equivalent (summer) 1900 m 3 /d flow to full treatment Sewage feed started 12th February 1998. Principle of Operation. In. Out. Screened crude sewage.

Télécharger la présentation

Located in Exmoor National Park, with nearby bathing beach

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Porlock Sewage Treatment Plant Site data • Located in Exmoor National Park, with nearby bathing beach • 3800 population equivalent (summer) • 1900 m3/d flow to full treatment • Sewage feed started 12th February 1998

  2. Principle of Operation In Out Screened crude sewage Treated & disinfected effluent Waste Sludge (to further treatment) Air in

  3. Membrane Filtration Solids Virus Air Treated effluent Bacteria Membrane

  4. Porlock Treatment Building Permeate Pumps 4. Aeration Tanks 1 - 4 2. Crude Effluent inlet Tidal Storage Fine Screens 3 mm Final Effluent out Anoxic recycle Tank Blowers 1. 3. Washing Tank Membrane Units

  5. Porlock Aeration Tank MLSS Feb 98 - Sept 99

  6. Porlock BOD Removal Feb 98 - Jan 00

  7. Porlock NH3/4 Removal Aug 98 - Apr 99 No ammonia consent No dissolved oxygen control

  8. Porlock Faecal Coliforms Feb 98 - Jan 00 Sampling contamination identified Intensive sampling periods

  9. Porlock Faecal Coliphage Virus Feb 98 - Jan 00 Change of test procedure

  10. Porlock Final Effluent Turbidity Turbidity meter set up incorrectly - readings higher than actual Feb - June 1998

  11. Porlock STW- Compliance Results Kubota Submerged Membrane Process June 1998 – November 1999