Pre-Treatment Plate Settler P ilot Program PowerPoint Presentation
Download Presentation
Pre-Treatment Plate Settler P ilot Program

Pre-Treatment Plate Settler P ilot Program

191 Vues Download Presentation
Télécharger la présentation

Pre-Treatment Plate Settler P ilot Program

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. Pre-Treatment Plate Settler Pilot Program MRI Sales Seminar 08/20/2009 Don Bersell Meurer Research Inc 6270 Joyce Dr Golden, CO 80403 P- 303-279-8373 F- 303-279-8429 E- dbersell@meurerresearch.com W- www.meurerresearch.com

  2. Overview • Currently 11 pilot units in the fleet. • These are excellent sales tools for Plate Settlers, Flocculators, & Cable-Vacs • Cost is only $2000 per month. • Mostly piloted for membrane pre-treatment. • The standard 110 GPM unit can operate as low as 35 GPM. • Installation note- Place tank on a fully supported level floor. • Unit needs (2) 120VAC 20 Amp circuits. • Client to provide lifting equipment for tank (6,500 LBS) • MRI includes 1 trip (2-3 days) for start-up and training. (unit needs to be piped, powered, and ready for water before we arrive) • Please give as much notice as possible to reserve a unit.

  3. Equipment Review

  4. Equipment Review

  5. Equipment Review

  6. Pilot Applications

  7. Pilot Test Locations

  8. New Pilot Control System Development Remote monitoring & operation, online influent & effluent turbidity measurements, flow pacing of chemical pumps, touch screen operation, record influent flow remote data logging & report generation.

  9. New Pilot Control System Development Quick electrical & tubing connections for easy set up.

  10. Additional Pilot/Application Tanks Available 3-5 GPM Acrylic Lab Tanks (Time Machine)

  11. Additional Pilot/Application Tanks Available Tilt Tank

  12. Additional Pilot/Application Tanks Available MBR Pilot