1 / 8

All Experimenters’ Meeting

All Experimenters’ Meeting. October 07, 2013. Accelerator Operation Summary . From : September 30, 2013 (0000 hours) To: October 07, 2013 (0000 hours). Calendar Week # 40 NuMI Weekly Integrated Intensity 6.61 E18 protons

baakir
Télécharger la présentation

All Experimenters’ Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. All Experimenters’ Meeting October 07, 2013

  2. Accelerator Operation Summary From : September 30, 2013 (0000 hours) To: October 07, 2013 (0000 hours) Calendar Week # 40 NuMI Weekly Integrated Intensity 6.61 E18 protons BNB Weekly Integrated Intensity 0.0 protons NMuonWeekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 1.46 E13 protons Beam Hours To NuMI 149.35 hours

  3. Status /Work Completed/Plans • Proton Source • Tuning & Studies • LRF3 interlock module and relay • Main Injector • Tuning • Kicker firing issue • Beam to Switchyard & MTest • Tuning • Septa work • Recycler Beam Studies • Investigated aperture restriction (MI-30) • Access (October 8-10th) • NuMI • Tuning • Switchyard • Work on MI-52 Septa troubleshooting • Work on extraction and beamline tuning • MTest • Tuning • NMuon • Installing magnets and connecting instrumentation

  4. Shutdown • Beam Off • Tuesday, October 8th @ 0400 • MI/Recycler Supervised Access • Keys available at 0700 • IPM installation, MI-52 Septa • Obstruction inspection • Linac • Beam for Booster studies • Linac Controlled Access • Booster Studies • Studies until 0900 • Booster Controlled Access • No Booster Cavity Installation • Switchyard & Beamlines • NMuonSafety System Tests • Maintenance • NuMI • Dehumidifier work • Maintenance • Muon Campus • Vacuum work • Magnet thermal scans • Startup • Thursday, October 10th @ 1200 • Keys returned • Search and Secure MI • Startup

  5. Schedules and Links: • Schedule can be accessed from the Operations Home Page • - Schedules -> Operations Schedule • Direct link to schedule • - http://www-ad.fnal.gov/ops/schedule.html

More Related