1 / 22

Growth Milestones

1942 Foundation 1950s Manufacture of Aerospace components 1960s Design & Manufacture first Landing Gear systems Manufactured the Apollo lunar module landing gear 1970s First Major R&O Contract for USAF 1985 Management buy-out First major military manufacturing contracts

bisa
Télécharger la présentation

Growth Milestones

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1942Foundation 1950sManufacture of Aerospace components 1960sDesign & Manufacture first Landing Gear systems Manufactured the Apollo lunar module landing gear 1970sFirst Major R&O Contract for USAF 1985Management buy-out First major military manufacturing contracts (C-130, F-4, F-15, KC-135R) 1986Listed as a Public company (TSX:HRX) Growth Milestones

  2. Creation of Gas Turbine Division Creation of Aerostructure Division Merger with Devtek Corporation Design Engineering Expansion Awarded 10 year USAF R&O contract Acquisition of Progressive Inc. (Dallas) Celebrated 65 years Acquisition of Eagle Tool and E-2 (Ohio) Opening of Héroux-Devtek Mexico Growth Milestones

  3. Toronto City of Montreal Kitchener Cleveland Laval Longueuil Dorval Arlington Cincinnati Springfield Héroux-Devtek Today Queretaro • 358 M$ Annual sales in Fiscal 2011 • 1650 Employees • 13 Facilities/Offices in North America • Financially Sound Company • Major Investments during the last 3 years • Access to Capital

  4. Héroux-Devtek Sales 358 338 Financially sound 308 320 283 256 233

  5. Our Customers END USERS O.E.M.s TIER I

  6. AEROSTRUCTURE DIVISION’S CAPABILITIES Complex Kitting Aircraft Value-Added Assembly Machining Services • 5 Axis high speed and • conventional profile milling • Aluminum & Titanium • Tooling & Support • Machined part/hardware • Kits to support aftermarket/ • aircraft modifications • Small business partner • Raw material integrator • Methods/concept • Development • Manufacturing R&D • Customer support • Vacuum/dip brazing • Hole drilling-fastener installation • Wet sealant application • Cold expansion of holes • Bushing installation • Emerging business for • structural assembly Broadening services to provide ultimate customer satisfaction

  7. STATE OF THE ART MACHINING AND ASSEMBLY FACILITY 12 large 5-axis gantries, 270,000 sq ft climate-controlled facility

  8. Landing Gear Division

  9. Engineering Design Precision Manufacturing Assembly Repair & Overhaul • 90 Engineers • CATIA V5-R17/18 & V6 • MBD/DPD • Full Test capabilities: • Drop test tower up to 100,000 lbs • Small to Large size landing gear components • Hydraulic actuators • Rotor Hubs • Complete system integration • Full landing gear systems • Supply Chain Management • Fully Integrated facility • Complete support • I.L.S. LANDING GEAR DIVISION’S CAPABILITIES Building on Experience to Design the Future

  10. Design & Development Office St-Hubert 90 experienced engineers 2 D R O P T E S T T O W E R S S T A T I C - F A T I G U E - E N D U R A N C E Drop Test Tower Specification • Load Range (pounds): 5,000- 100,000 • Max. Sink Speed (ft./s): 24 • High Speed Data Acquisition System (Ch.) 64/96 at 5kHz per channel Static/Fatigue/Endurance Test Rig Specification: • 3200 sq. ft. of Floor Space • Servo Controlled Loading Actuator: 16 • Data Acquisition System (Ch.) 64/128

  11. HD’s route to integration We use our Engineering Expertise as a Locomotive 80’s 2000 2010 90’s • Product improvement • One piece forging • Corrosion Protection • Credibility • Landing Gear Design • Design / Manufacture the Learjet 45 and RQ4A & B • Design Development and Qualification • X45, BA 609, F-35 uplocks, Legacy 450 and LJ 85 • Systems Design and integration • W&B, Steering, Retraction • CH53K and Dassault • MFG of Spare parts • Equipment • Programming • Know-how of critical part • Build To Print Assy • C130 Assy to Lockheed • KC-135 and P3 to US Government • Repair & Overhaul : • Finishing • Assembly • Performance knowledge

  12. Integrator’s challengesInnovation Understand the Customer’s requirements Constraints that will have to be managed: • Development schedules are challenging • Limited Allocated space and geometry of our product • Loads and Interfaces • Changes during the development phase

  13. Integrator’s challengesBetween the OEM and the supply chain 12 months 6 months 6 months 24 months

  14. Integrator’s challengesBetween the OEM and the supply chain 12 months 6 months 6 months 24 months

  15. Integrator’s challengesBetween the OEM and the supply chain 12 months 6 months 6 months 24 months

  16. Integrator’s challengesBetween the OEM and the supply chain 12 months 6 months 6 months 24 months

  17. 12 months 6 months 6 months 24 months Integrator’s challengesBetween the OEM and the supply chain DWG release First delivery Typical Lead time – 18 months

  18. Integrator’s challengesBetween the OEM and the supply chain

  19. Innovation Customer wants more: Performance Monitoring New Material Low Life Cycle Costs Noise Reduction Weight Reduction Manufacturing Processes

  20. Innovation Chrome Green

  21. Thank you ! MERCI Thank You !

More Related