E-Series PMA

E-Series PMA. MY Program Team 2007.5. Program Control All yrs. PMA growth Items All yrs. MY Program Team 2004. MY Program Team 2005. MY Program Team 2006. Program Mgt. K Carduner P Ahmed Work Planning S Needham (D Goetz?). Program Mgt. B Baker Work Planning C Lisko D Goetz

bond
Télécharger la présentation

E-Series PMA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E-Series PMA

  2. MY Program Team 2007.5 Program Control All yrs PMA growth Items All yrs MY Program Team 2004 MY Program Team 2005 MY Program Team 2006 Program Mgt. K Carduner P Ahmed Work Planning S Needham (D Goetz?) Program Mgt. B Baker Work Planning C Lisko D Goetz B Cassista VPMC C Sheufelt Activities Process B Cassista L Robertson Forums Rotate Program Mgt.. D Brown S Selley Work Planning S Edwards B Cassista Program Mgt. M Williams M Mifsud I Sheikh Work Planning L Robertson H Paison Program Mgt. P Page D Jowa Work Planning K Reardon H Paison PMA Structure Special Studies S Edwards & D Goetz PMT/PAT Support Chassis – D GoetzElectrical – S Edwards Body – H Paison Climate Control – D Goetz Powertrain – C Orr – Powertrain Systems J Dinneen – As Installed Systems

  3. Activities NOT Support – MLA Activities; Containment plan tracking Additional Activities (that may require extra resources) – Develop papers for team,etc Core duties: Develop & update MY plan: all workstreams, Develop critical metric workstreams PMT & QOS Use Plan as bases for VPP 30/60 day forecast Status plan for 30/60 forecast & present critical path analysis as data indicates. Incorporate Metrics into plan, 30/60 report PMA Responsibilities

  4. MY(Model Year) Plan MY Plan Workstreams FPDS Template (Customized to current scope and practices) Birdseye Yields Reports VPP 30/60 Forecast Critical Metrics M/S Deliverables Metrics

  5. PM MY Team PMA Core Optional Prog Control VPMC Consensus

  6. MY Team PMA Core Responsibilities • Develop by working with Program Team, and Backbone engineers plans for each functional work streams and the customization of the FPDS Template. • FPDS deliverables and Critical Metrics are to be included within the MY plan using the FPDS template as a starting point. Program scope and current Ford practices will be used to customize. • Integration of the MY plan with all elements including PMT/PAT Workplans is required. • Establish critical elements for the Powertrain plans and integrate them into the MY plan. • The MY plan is broken into two segments, • 1-- Pre –SI work plan with a high level VPP – M/S and critical high level events only, • 2 – Development of preliminary MY plan (Critical Path items) at SI & • 3 – Final in depth MY plan at SC. • Achieve sign off of MY plan and supporting workplans at <SC> or other team-agreed milestone • Use the VPP as the method to record buy in by the various owners of the MY workstreams. • Based on the MY plan,which has been developed and maintained; • Publish a Program specific VPP (Vehicle Program Plan), • Develop and present at the PST accurate 30/60 day forecast, with updated R/Y/G assessments& • Perform risk analysis to identify timing issues and elevate to appropriate forum for discussion and resolution.

  7. MY Team PMA Core ResponsibilitiesCont. • Use the Timing PAT meeting as the forum to resolve identified MY issues. • Generate (KO-SC) and maintain (SC-CC) all PPM related workplans working with PPM Natural Work Group Supervisor and Program Team. • Publish the BirdsEye Report and Health Chart monthly based on the PPM plan. • Develop as required, various adhoc timing studies/charts/reports working with program management and the Program Team. • Track part development beginning with targets and finishing with PSW. Highlight and maintain w/metrics the critical items for that appropriate time frame of the program (SI-LR). • Coordinate the updates Program QOS deliverables in Integrator for each approaching FPDS Milestone (SI-LR) • Maintain on the E-Series Team Home page, up-to-date workplans and current 30/60 reports

  8. PMT/PAT PMA Core Responsibilities • Develop PMT/PAT’s workplans by working with Program Team, Backbone engineers, and Suppliers. • Working with suppliers,obtain and include Commodity workplans in the PMT/PAT workplans. • Ensure integration into Vehicle Level Workplan(i.e. all the "give and get" events are identified on the PMT/PAT Workplans and communicated to all affected teams) (SI-SC) • Working with suppliers obtain the necessary updates (SI-LR) to maintain their plans in the PMT/PAT integrated file. • Maintain subject PMT/PAT plans • Present 30/60 to the PMT/PAT using the current PMT/PAT plan. • Perform risk analysis to identify timing issues and elevate to the appropriate forum for discussion and resolution • Track part development beginning with targets and finishing with PSW including P Authority Status for all new tooled end items (SI-LR) • Update PMT/PAT QOS deliverables in Integrator for each approaching FPDS Milestone (SI-LR) • Support Timing PAT meeting to ensure issues are identified and resolved. • Work with PMT/PAT leaders as required to develop various adhoc timing studies/charts/reports • Maintain on the E-Series Team Home page, up-to-date workplans and current 30/60 reports

  9. PMA - Optional • Perform Design Studio Workplanning functions: • Generate detailed tracking reports on appearance items by commodity (SI-ST) • Attend Clay Reviews, Styling/Issues Meetings (SI-ST) • Track Clay Feasibility for initial release and revisions (SI-ST) • Track Clay Issues for AST agenda setting (SI-ST) • Maintain AST issues list • Perform Open to Go Tracking (CC-J1+90 days)

  10. VPMC Core Responsibilities • Lead and coordinate the Workplanning process for the nameplate • Assist MY team in achieving VPP w/supporting workplans sign off at <SC> or other team-agreed milestone • Plan, facilitate and chair the Timing PAT meeting ( which is combined w/Prototype PAT). • Ensure workplan compatibility across model years. • Assist MY team in performing risk analysis to identify timing issues and elevate to appropriate forum (PST Meeting) for discussion and resolution • Attend and support major program meetings. • Assist Model Year Teams, Program Management and the Program Team on development of various adhoc timing studies/charts/reports • Coordinate the day-to-day work activities of all Program PMA’s including resource requirements/workload management, coaching, team building, seat assignments etc. • Update as required Program Cycle data (Milestones in Integrator). • Support PPM Roadshow presentation to Program Team at <KO> and subsequent milestones (KO-CP)

  11. E-Series PMA Back up

  12. Program Mgt Organization

  13. PMA – Out of Scope • Out Of Scope --- Responsibilities not Performed by VPMC/PMA’s • Perform the Purchasing Material Logistics Analyst (MLA) function including:Establish prototype delivery • promise dates with suppliers and ensure information is entered into GPIRS • Maintain and monitor supplier promise dates and confirm shipment of parts on the promise date • Obtain Red Borders for promise dates beyond the MRD, review them with the program team, obtain • consensus for the support plan and enter information into GPIRS • Lead the Red Border Meeting to resolve issues and develop support plans • Resolve warehouse impounds • Updating WERS with Weight Information • Populating information in FDVS (ie DVPs, FMEA, etc.) • Detailed Color Harmony tracking beyond Color Harmony timing plan (ie populating & maintaining • Color Trax, detailed tracking of mastering process, etc.) • Detailed vehicle test planning & tracking

  14. E-Series PMA R&R Matrix