An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tab 64 Accelerating Project Delivery California Transportation Commission August 22, 2012 California Department of Transportation

  2. State Contract Act Requirements • Emergency • Allows for waiving or postponing certain requirements • Paramount Bridge replacement is an example • Non-emergency • Working within the requirements, acceleration is still possible.

  3. Project Delivery Acceleration Toolbox • Developed by Caltrans • Describes options to accelerate project delivery • Initiated in 2002 and updated regularly • To date, 169 improvements identified • Includes: • Training for Project Managers and Engineers • Standardized processes or forms • Project Development and Contracting

  4. Project Development Phase • NEPA Delegation • Permit Engineering Evaluation Report (PEER) • Project Agreement Construction Tool (PACT) • Programmatic Agreements • 106 Agreement with SHPO • Biological Opinions with US Fish & Wildlife Service (Giant Garter Snake, Red-legged Frog, San Joaquin Kit Fox, Desert Tortoise, etc.)

  5. Innovative Construction Contract Tools • Construction Partnering • Cost + Time (A+B) Contracting • Incentives/Disincentives • Smart (Flexible) Start • Accelerated Bridge Construction

  6. Merging Design and Construction • Pilots In Progress • Design-Sequencing • Design-Build

  7. Upcoming Opportunities • Construction Manager/General Contractor • Job Order Contracting • Terrestrial Laser Scanning (Surveys) • 3D Constructability reviews • Conflict Detection • Machine Guidance • Map - 21