RDA : Resource Description and Access

DESCRIPTION

RDA : Resource Description and Access. Deirdre Kiorgaard Australian Committee on Cataloguing Representative to the Joint Steering Committee for the Development of RDA. AACR to RDA. AACR and descriptive cataloguing. AACR is a robust standard, but …

1 / 29

Download Presentation
Télécharger la présentation

RDA : Resource Description and Access

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RDA : Resource Description and Access Deirdre KiorgaardAustralian Committee on Cataloguing Representative to the Joint Steering Committee for the Development of RDA

  2. AACR to RDA

  3. AACR and descriptive cataloguing • AACR is a robust standard, but … • ‘Class of materials’ approach is no longer valid • Need for principles-based instructions • Need for extensibility • Designed for the card catalogue not digital world • Data needs to be usable in the web environment • RDA offers better coverage • Visual, Archival & Online resources

  4. Brave new world? • The power of the search engine

  5. Next generation catalogues links full text table of contents tagging reviews synonym control “The OPAC has tended to favour an increase in the number of access points over the effective presentation of the relationships between resources. … It has been the failure to exploit the navigational potential of this rich metadata that has given the OPAC such a bad name.” Danskin, 2006.

  6. Navigation and relationships • Controlled forms of name • Preferred names for works • Carefully crafted subject vocabularies

  7. RDA and relationships • Preferred titles for works and expressions • Links & relationships between works, expressions, manifestations and items • Relationships between works etc, and their creators, etc • Relationships between persons, families and corporate bodies

  8. RDA and FRBR/FRAD/FRSAR • The value of conceptual models • Identify & define the things that are important - entities • Identify & define the attributes that characterise the entities • Identify & define significant relationships between entities • FRBR/FRAD/FRSAR • Identify & define bibliographic entities, attributes and relationships • FRBR – user tasks“ a structured framework for relating the data recorded in bibliographic (and authority) records to the needs of theusers of those records.”

  9. FRBR in practice • Used in databases Red Light Green, Fiction Finder, xISBN, Austlit, Music Australia, Trove • Used in library systems and catalogues VTLS – Virtua • FRBR Bibliography http://www.ifla.org/VII/s13/wgfrbr/bibliography.htm

  10. FRBR in practice – Fiction finder (1)

  11. FRBR in practice – Fiction finder (2) Work

  12. FRBR in practice - Trove Work

  13. FRBR in practice - VTLS Work Expression Manifestations

  14. FRBR in practice – Austlit (1) Work Related works

  15. FRBR in practice Austlit (2) Expression Manifestations

  16. Benefits of FRBR • A new way of providing access • Improved navigation of the catalogue for users • Improved catalogue displays • For researchers – a more organised display • For the general public – a less cluttered display • Improved efficiency of data creation & maintenance

  17. The (not so) secret life of catalogue data (1) “metadata increasingly appears farther and farther away from its original context” Shreeves, Riley and Milewicz (2006). • Shared library databases • Digitisation projects • Institutional repositories

  18. The (not so) secret life of catalogue data (2) • The GLAM sector Galleries, libraries, archives and museums • The Internet Catalogue records have jumped the fence • Leading to: Services based on data aggregations Sharing of library data with other sectors Exposure of library data to the internet

  19. Whose standards? “Standards are like toothbrushes; everyone agrees they are a good idea, but nobody wants to use anyone else’s.” Baca (2008) • Library standards • Digital library standards • Cultural institutions • Publishing

  20. “Seeing Standards:A Visualization of the Metadata Universe”

  21. http://www.dlib.indiana.edu/~jenlrile/metadatamap/

  22. Achieving commonality When choosing the standards to use within the library sector: • use existing standards where they exist • influence the development of existing standards to cover any perceived gaps or to address any issues When working with other communities: • use elements from existing standards where needed, rather than re-inventing the wheel • use and/or develop common vocabularies wherever possible • use or build upon common models and principles • make our element sets available on the web

  23. RDA and achieving commonality • Uses external vocabularies • Jointly develops new vocabularies • Draws on standards in related communities • Is built on common models and principles • Includes mappings to other standards/schema

  24. RDA in the digital world • Clearly defined element set • better granularity, improved mapping to other schema, e.g. Dublin Core, ISBD, MODS/MADS, MARC21 • Greater emphasis on relationships • Better navigation and displays • Better interoperability - common vocabularies • Content type, carrier type, media type; Relationship designators; Encoding formats, etc. • Making vocabularies accessible • RDA and the semantic web

  25. Sample – RDA instructions • RDA as a cataloguing toolInteractive and onlineIntegration with policies and processes

  26. Draft implementation timeline

  27. Further information • Australian implementation http://www.nla.gov.au/lis/stndrds/grps/acoc/rda.html Enquiries: nlarda@nla.gov.au • Subscription options and Australian pricing http://www.rdatoolkit.org/ • MARC changes to support RDA http://www.loc.gov/marc/RDAinMARC29.html • US testing http://www.loc.gov/bibliographic-future/rda/index.html

  28. Forthcoming publications • Practical Cataloguing: AACR, RDA and MARC21 / Anne Welsh and Sue Batley ISBN: 978-1-85604-695-4 • Introduction to Resource Description and Access : Cataloguing and classification in the digital era / Shawne D Miksa ISBN: 978-1-85604-683-1 • Introducing RDA: A Guide to the Basics / Chris Oliver ISBN 978-0-8389-3594-1

  29. Thanks …. Questions?