1 / 5

PHENIX Status

PHENIX Status. Stefan Bathe, Time Meeting , June 1, 2010. 7.7 GeV Close-Out. BBCLL1(>1 tubes). 1.5 M minimum bias events recorded @ 7.7 GeV. Minimum Bias Event Rate. run index (= store). Average rate of 1.8 Hz in 2 nd half of 7.7 GeV run. Muon Trigger Commissioning.

chyna
Télécharger la présentation

PHENIX Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Status Stefan Bathe, Time Meeting, June 1, 2010

  2. 7.7 GeV Close-Out BBCLL1(>1 tubes) 1.5 M minimum bias events recorded @ 7.7 GeV Stefan Bathe

  3. Minimum Bias Event Rate run index (= store) Average rate of 1.8 Hz in 2nd half of 7.7 GeV run Stefan Bathe

  4. Muon Trigger Commissioning • No collisions in PHENIX @ 11.5 GeV • Commissioning new muon detectors with cosmic rays • Crucial for next year’s W physics program • 2-person watch shifts + experts Stefan Bathe

  5. Fire Alarm Last Night • At 1:00am last night smoke alarm shut off experiment • Originated from rack WCB2 rack (holds MuID Blue Logic electronics) • WCB2 was shut off first by safety system • Smoke apparently leaked out of rack enough to trigger VESDA HSSD system, which shut off entire experiment • Took access, no visible burning, but noticeable smoke odor • Turned circuit breakers back on • Re-established flammable gas flow • Currently switching on racks (except for WCB2), front end electronics • Expect to be back up tomorrow morning • Need 60-90 minute access to evaluate course of alarm Stefan Bathe

More Related