1 / 4

PHENIX Run-13 status

PHENIX Run-13 status. Hubert van Hecke for the PHENIX collaboration. Phenix efficiencies. Luminosity to date. Silicon luminosity counters. 1.2<eta<2.4 48 segments in phi 2 segments in z Can select single hits in a phi segment, Or hit pairs in a phi segment.

donat
Télécharger la présentation

PHENIX Run-13 status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 14 May 2013

  2. Phenix efficiencies Time - 14 May 2013

  3. Luminosity to date Time - 14 May 2013

  4. Silicon luminosity counters 1.2<eta<2.4 48 segments in phi 2 segments in z Can select single hits in a phi segment, Or hit pairs in a phi segment How it is done: self-triggered data streams into FPGAs (max 2Tbits/s), where hits are formatted for the event data stream. There is enough space left in the FPGAs to split the incoming stream and set up luminosity counters. RHIC abort gap RHIC abort gap Run13 √S = 510 GeV p-p Data Hit-scaled scalars Run13 √S = 510 GeV p-p Data Two station coincidental scalars Empty bunches Stat error<10-4 Time - 14 May 2013

More Related