PHENIX Run-13 status

PHENIX Run-13 status. Hubert van Hecke for the PHENIX collaboration. Preparations continue. Tuning up the trigger system Check out subsystem monitoring Prepare the fast-production system With beam, system checks and full-detector runs No beam: calibrations (IR access when available)

fayola
Télécharger la présentation

PHENIX Run-13 status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Hubert van Hecke - 05 Mar 13

  2. Preparations continue • Tuning up the trigger system • Check out subsystem monitoring • Prepare the fast-production system • With beam, system checks and full-detector runs • No beam: calibrations • (IR access when available) • On Friday, move the Silicon detectors in from the retracted position. Hubert van Hecke - 05 Mar 13

  3. Criteria for start-of-physics • 109 bunches in the machine • Longitudinal polarization established, <5% transverse component • >=55% polarization at the start of the store • Beta* = 0.65 • >1*1011 protons/bunch Hubert van Hecke - 05 Mar 13