1 / 8

PHENIX Status

PHENIX Status. Continued Work on Detector Commissioning and Setup. Minbias trigger detectors setup Beam Quality – vertex, backgrounds Level-1 trigger setup DAQ development and setup. Vertex Distribution. Vertex distribution looks very nice! PHENIX BUP request (70% delivered in +/- 30cm).

senta
Télécharger la présentation

PHENIX Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Status • Continued Work on Detector Commissioning and Setup. • Minbias trigger detectors setup • Beam Quality – vertex, backgrounds • Level-1 trigger setup • DAQ development and setup J. Lajoie - RHIC Machine/Experiment Meeting

  2. Vertex Distribution • Vertex distribution looks very nice! • PHENIX BUP request (70% delivered in +/- 30cm) J. Lajoie - RHIC Machine/Experiment Meeting

  3. Main bunch Satellite bunches Satellite Bunches • Little intensity in satellite bunches • Doesn’t appear to grow dramatically within a store J. Lajoie - RHIC Machine/Experiment Meeting

  4. Backgrounds • Backgrounds, particularly in MUID North (yellow beam), have been a problem • Fixed with collimation early morning Jan 11 (thanks Angelika!) MuID N background counters ZDC coincidence MuID S background counters J. Lajoie - RHIC Machine/Experiment Meeting

  5. LL1 Data: Simulation: MuID LL1 Trigger Setup • New Level-1 Trigger for Muon Identifier: • South arm timed in and ready, north arm underway… Muon Identifier J. Lajoie - RHIC Machine/Experiment Meeting

  6. DAQ • Redesigned Event Builder up and running. • 24 subsystem elements (granules) • ~4.5kHz with six buffer boxes J. Lajoie - RHIC Machine/Experiment Meeting

  7. DAQ: Multi-Event Buffering • This year we will exercise a feature of our front-end electronics that allows concurrent readout and digitization. • Reduces dead-time at high trigger rates Single-Event Buffered Multi-Event Buffered Clock Ticks Between Events Note suppressed zero! J. Lajoie - RHIC Machine/Experiment Meeting

  8. Tests of Multievent Buffering • Need to evaluate the effect of multievent buffering on data • Alignment, calibration and production run on 3M events • QA ongoing, looks good so far Multi-Event Buffered: DT<500 clks Single-Event Buffered ZDC Energy BB Charge Sum J. Lajoie - RHIC Machine/Experiment Meeting