110 likes | 241 Vues
HES Meeting with Mike Spata. Aug. 8, 2006 @ Tohoku University 1. Pre/Post chicane layout 2. Radiation budget, Local dump design 3. Diagnostic Instrumentation 4. Beam transport optics (raster, multiple scat.) 5. Vacuum chamber design. SNN 20060808. Troubles at E01-011. PS installation
E N D
HES Meeting with Mike Spata Aug. 8, 2006 @ Tohoku University 1. Pre/Post chicane layout2. Radiation budget, Local dump design 3. Diagnostic Instrumentation 4. Beam transport optics (raster, multiple scat.)5. Vacuum chamber design SNN 20060808
Troubles at E01-011 • PS installation • Communication between HKS Gr., Acc Gr, Hall C engineers, surveyors and Walter’s Group • Magnets Power Supplies (Water supply, instability of PS) • FSD interlock (ion chamber?) • Viewer rad. Damage • Vacuum problem • Beam tuning procedure, beam punch through • Viewer limit mode affects other halls
The New Splitter (Final) GAP 190mm 102 l/min (0.5MPa) 208 V x 957 A x 224 turns
No DZ, EZ Pre Chicane
Drawing of the HES + HKS This part design is necessary to finalize the HES position HES HKS New SPL
How much distance? Any diag. tools?
Tilt Angle Optimization & Beam Current • Due to higher primary beam momentum, we expect less e’ background • Improve HKS K+ ID trigger Possibility to increase beam current 100 mA option is possible? Radiation Budget Photon Dump Target heat problem
PS, Water requirement • HKS • Q1 160Vx1000A (102Vx600A);50 l/min (0.6MPa) • Q2 160Vx1000A (50Vx400A);17 l/min(0.4MPa) • D 252V x 1254A (Mitsubishi); 135 l/min (0.4Ma) • D-PS 73 l/min (0.9MPa) • HES • SPL 205x1020A (106 l/min,0.5MPa) • Q1 110Vx880A (41 l/min,0.5MPa) • Q2 110Vx880A (42 l/min,0.5MPa) • HES D 233Vx1100A PS (from Japan) 150 l/min+70 l/min(PS) Design input 35 C (95 F) D 30 K (18F)
Schedule • 2006 Aug • Irons are dispatched to the company • Final design of the coils • Cut iron will be delivered by the end of 2006 • 2006 Aug 24-28 • Osamu,Nue will visit JLab • Early 2007 • Assembly and field mapping • Summer~Autumn 2007 • Shipping SPL+HES(QQD) to JLab