1 / 7

CTF 172 MPRA Phase 2 Concept of Operations

CTF 172 MPRA Phase 2 Concept of Operations. CAPT Lance Scott, Commander Task Force 172 3 Jul 14 “Got a sub problem?”. Outline. Forces Available Phase 2 Scheme of Maneuver Liaison Officers Airspace Risk Levels. Forces Available. Phase 2 Scheme of Maneuver.

devon
Télécharger la présentation

CTF 172 MPRA Phase 2 Concept of Operations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CTF 172 MPRA Phase 2 Concept of Operations CAPT Lance Scott, Commander Task Force 172 3 Jul 14 “Got a sub problem?”

  2. Outline • Forces Available • Phase 2 Scheme of Maneuver • Liaison Officers • Airspace • Risk Levels

  3. Forces Available

  4. Phase 2 Scheme of Maneuver 2 x 24-hour TASW stations (~90% of sorties) • CTF 174TACON • ASW weapon and buoy loadout – 4 x lightweight torpedo 1 x Ready-2 Alert per ATO day • CFMCC OPCON • Any mission: Theater/DS ASW, ISR, ASuW • Swing-loaded: 2 x torpedo and 2 x Harpoon • 2hour alert, resets at 0600

  5. MPRA Liaison Officers CFACC AOC - 4 X O-4 CFMCC MOC - 5 x O-4 CTF 170 embarked CSG – 1 X O-6/O-5, 1X O-3 SCC – 1 X O-3 CTF 176 embarked ESG – 1 X O-3 SCC – 1 X O-3 CTF 174 1 X O-4, 1 X O-3

  6. Freeplay Airspace Shared use • no “true” Freeplay airspace MPRA assigned DCA boxes below 5k Dynamic retasking from ATO assigned airspace will require coord with CAOC and FACSFAC to ensure safety of flight • use of LNO is critical to success

  7. Risk Levels Coalition structure vs. universal interpretation of acceptable risk to aircraft Recommended mitigation: • Clear direction: “MPRA shall not close within a hostile unit’s standoff range without OPCON (CFMCC) approval.”

More Related