dewei
Uploaded by
4 SLIDES
186 VUES
40LIKES

Technology Upgrades Overview at Mead Hall - Summer 2012

DESCRIPTION

This report provides a concise summary of the technology upgrades implemented at Mead Hall as discussed during the Technology Committee meeting on November 10, 2012. Key upgrades included the installation of an HP ProCurve 4000m core switch, identifying and replacing faulty edge switches, and simplifying network topology. Additionally, a pfSense router/firewall was installed, an IPSec VPN tunnel was established between campuses, and WiFi access points were upgraded. Ongoing and future improvements include enhancing network bandwidth and raising domain functional levels to ensure optimal performance.

1 / 4

Télécharger la présentation

Technology Upgrades Overview at Mead Hall - Summer 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Summer 2012 A Brief Review of Technology Upgrades at Mead Hall 11.10.2012 Technology Committee Meeting

  2. Aiken Prep Network Infrastructure • Installed HP Procurve 4000m as core switch • Located and identified edge switches • Replaced faulty edge switches • Simplified topology • Installed pfSense router / firewall • Established IPSec VPN tunnel connecting campuses • WiFi APs • Installed additional AP • Corrected and matched configuration an all APs

  3. Servers and Services • Mead Hall Domain • Domain Membership for all PCs at each campus • Local domain controller at each campus • Elevated domain functional level to 2003 (soon 2008) • Hyper-V Server 2012 Hosts • Aiken Prep (production) • 2008 R2 domain controller • 2012 file server • St. Thaddeus (in progress) • 2008 R2 domain controller • 2012 file server

  4. Future Upgrades • High bandwidth link between campuses • WiFi network enhancement at both campuses • Raise domain functional level to 2012