1 / 2

Upcoming Strip Module WG Sessions at AUW on March 26th: Schedule and Discussion Topics

Join us for two Strip Module Working Group sessions on March 26th, from 11:15 to 13:00 and 14:00 to 15:45 at AUW. Detailed schedules can be found at [CERN Indico](https://indico.cern.ch/conferenceTimeTable.py?confId=158038#all). We will cover important topics such as the status of the 250 nm program, the building 180 status, results from 130 nm bonding trials, and more. Please send any suggestions for additional discussion topics to Ingrid or myself to ensure comprehensive coverage without overlaps with other IT-SC sessions.

dillan
Télécharger la présentation

Upcoming Strip Module WG Sessions at AUW on March 26th: Schedule and Discussion Topics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strip Module WG Sessions at AUW • We have been given 2 sessions (3 ½ hours) on Monday, March 26th • 11:15-13:00 and 14:00-15:45 • See https://indico.cern.ch/conferenceTimeTable.py?confId=158038#allfor details of the schedule • We’ll have to iterate on the schedule to make sure everything is covered without too many overlaps with the IT-SC strip: Combined Electrical+Mechanical, ITK-SC plenary, IT-SC readout and plenary sessions • Please let Ingrid and I know of any suggestions for talk topics

  2. Possible topics to cover from this group • Status and plans for 250 nm program: modules and multi-modules, petalets • Building 180 status • Report from ABCn130/HCC Conceptual Design Review with a list of open questions • Top layer (pad) layouts of ASICs with provisional list of external SMD components needed • Plans for 130 nm ASIC set: hybrids, modules, bus cables, EOS, SPP, DC-DC converters, general stave/petal electrical layout • Results from 130 nm bonding trials • LOI backup document status

More Related