Testing Update

Testing Update. Glen Wingerd Project Manager - INT. Testing Update - INT. Agenda Severity Priority Test Plan Update On the Horizon. Testing Update - INT. Severities Data Loss/Critical Error Loss of functionality without workaround Loss of functionality with workaround

Télécharger la présentation

Testing Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Testing Update Glen Wingerd Project Manager - INT TPTF

  2. Testing Update - INT • Agenda • Severity • Priority • Test Plan • Update • On the Horizon TPTF

  3. Testing Update - INT • Severities • Data Loss/Critical Error • Loss of functionality without workaround • Loss of functionality with workaround • Partial loss of a feature set • Cosmetic error / Documentation error TPTF

  4. Testing Update - INT • Priorities • System Unusable w/o fix • Significant Market Impact • Measurable Market Impact • Minor Market Impact • No Market Impact TPTF

  5. Testing Update - INT • Test Plan • Introduction • Evaluation Mission and Test Motivation • Target Test Items • Test Approach • Entry, Exit, and Suspension/Resumption Criteria • Deliverables • Testing Workflow • Test Environment • Roles and Responsibilities • Key Milestones • Risks, Dependencies, Assumptions, and Constraints • Management Process and Procedures • Appendix TPTF

  6. Testing Update - INT • CMM (3.5.0.011) Defect bundle – 8/28/07 • We have currently executed 23 of 23 total scripts. • Pass = 20 • Fail   = 3 • % Complete = 87% • DEFECTS • There are currently 3 Active Defects • There have been 9 Defects addressed and Closed • MIS (Build 1.1) –8/28/07 • We have currently executed 344 of 353 total scripts. • Pass = 148 • Fail   = 196 • % Complete = 42% • DEFECTS • There are currently 38 Active Defects • There have been 0 Defects addressed and Closed • There have been 20 defects deferred • EIP3 GRP 2 (Loopback) – 8/28/07 • We have currently executed 25 of 25 total scripts   • Pass = 23 • Fail   = 2 • % Complete = 92% • DEFECTS • There is currently 3 Active Defects • There have been ?? Defects addressed and Closed • EIP3 GRP 1 (Backend) – 8/28/07 • We have currently executed 11 of 11 total scripts for Smoke Testing • Pass = 3 • Fail   = 8 • % Complete = 27% • DEFECTS • There is currently 29 Active Defects • There have been 2 Defects addressed and Closed TPTF

  7. Testing Update - INT • On the Horizon • EIP3 Priority 4 (Loopback) - August • EIP3 Priority 5 (Loopback) - September • EIP3 GRP 2 (Backend) – September • EMS to MMS (for LMP) integration – September • Registration Integration 1 - September • Registration Integration 2 – September • CSI Drop 1 - September • CRR – September • MIS Build1.5 – September • CMM (w/ ERCOT customs) – October • COMS – REG2 – October • Registration Integration 1 - October • MMS to EMS (for LMP) integration – October • CSI Drop 4 - October • EIP3 Priority 4 (Backend) - October • EIP3 Priority 6 (Loopback) - October • EMS to MMS (for LFC) integration – November • MMS to EMS (for LFC) integration – November • NMMS to CRR integration – November • CRR to NMMS integration – November • CSI Drop 2 - November • CSI Drop 3 - November • CSI Drop 6 - November • CSI Drop 7 - November • EIP3 Priority 5 (Backend) – November • EIP7 MMS to NMMS integration - November • MIS Build 2.0 – November • EDS2 EDW – November TPTF

  8. Testing Update - INT • Questions? TPTF