METOP-A Instrument Status & Issues

METOP-A Instrument Status & Issues. J. Philip Green November 30, 2006. Current Instruments Status Notes _ AVHRR On In Measurement - Day/Night flight managed HIRS On In Measurement

dustin
Télécharger la présentation

METOP-A Instrument Status & Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. METOP-AInstrument Status & Issues J. Philip Green November 30, 2006

  2. Current Instruments Status Notes _ AVHRR On In Measurement - Day/Night flight managed HIRS On In Measurement MHS On In Measurement - Performing SIOV activities AMSU-A1 On In Measurement - Thermal Stabilizing AMSU-A2 On In Measurement - Thermal Stabilizing IASI On On-board processing disable GOME On Following SIOV timelines ASCAT On In Measurement - Cal over East site only GRAS On In occultation – Several mode transition SEM On In Measurement A-DCS On In Measurement SARR On In Measurement – B-Side SARP On In Measurement Metop-A StatusNovember 30, 2006

  3. HandoverSIOV to EPS V&V • SEM-2 November 30 • MHS December 7 • SAR-P January (same as A-DCS) • A-DCS January (pending on AR 6555) • SARR December 12 • AVHRR December 13 • HIRS December 14 • AMSU-A1 December 14 • AMSU-A2 December 14 • IASI January 9 • GOME January 10 • GRAS January 11 • ASCAT January 12

  4. Issues • Level 1B availability w/yaw steering corrections • Level 1B corrupted header information • EUMETSAT AVHRR geo-location findings • Data dropout • Between orbit – workaround implemented • Overlap between two consecutive orbits • HRPT / LRPT return to ops

  5. AVHRR Geo-location Issue • Cross Track Error

  6. AVHRR Geo-location Issue (Cont) • Along Track Error

  7. GOME ImageCourtesy EUMETSAT

  8. ASCAT ImagesCourtesy of EUMETSAT

  9. IASI First Image Integrated Infrared Imager of IASI shows Greenland Courtesy of EUMETSAT