1 / 6

SWAT Steering Committee Meeting

SWAT Steering Committee Meeting. SWAT Eldorado Valley Work Group. Chuck Russell, SRP Transmission Planning. August 17, 2010 Denver, Colorado. SWAT Eldorado Valley Work Group. Chuck Russell, SRP Transmission Planning. August 17, 2010 Westminster, Colorado.

earnest
Télécharger la présentation

SWAT Steering Committee Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SWAT Steering Committee Meeting SWAT Eldorado Valley Work Group Chuck Russell, SRP Transmission Planning August 17, 2010 Denver, Colorado

  2. SWAT Eldorado Valley Work Group Chuck Russell, SRP Transmission Planning August 17, 2010 Westminster, Colorado

  3. Slide 3 intentionally Removed

  4. Transmission Projects in WECC Regional Planning, Path Rating Process, or Development Chinook Zephyr TransWest Express SWIP High Plain Express Pinal West to Pinal Central Pinal Central to Browning Pinal Central to Tortolita Morgan to Pinnacle Peak Palo Verde to Sun Valley Sun Valley to Morgan SPPR Navajo Transmission Project Segment 1 Palo Verde–Devers II California Portion Tres Amigas Santa Fe Palo Verde-North Gila II SunZia South Line

  5. N. Las Vegas, incl. Navajo (Harry Allen, Crystal) Draft Eldorado Valley Existing Capacity and Proposed Projects Wyoming Montana Zephyr3.0 GW Chinook 3.0 GW TWE 3.0 GW ON Line, SNIP 1.5-3.0 GW Potential EV Project Withdrawals (3.0 - 6.0 GW) Potential EV Project Injections (16.1-19.6 GW) Eldorado Valley (El Dorado, Marketplace, McCullough, Mead) Ivanpah – Devers 230 kV 0.4 GW Add. CTPG Alternative Projects Hoover Mead Green Upgrade 1.5 GW (StarTrans) New Mexico Navajo Tx Project 1.6 GW LV to LA Marketplace to Rancho Vista - 500 kV 1.5 GW (En. Cap. Prtns.) Santa Fe ?1.5 GW Blackline ? 2.0GW Pony Express 3.0 GW SMRT 0.4-1.5 GW Four Corners Southern California (Adelanto, Devers, Imperial Valley, Lugo, Victorville, others) Arizona (Palo Verdes, Westwing, others) West of River 10.6 GW East of River 9.3 GW

  6. Status • Work Plan in final stages • Tasks • Inventory • Conceptual Plan • Testing Conceptual Plans • Schedule • Initiated Plan, Data Requests • Conceptual Plan to begin upon Inventory completion • Studies to begin upon development of Conceptual Plan • Complete by end of first quarter 2011

More Related