The City of Vincennes conducted an Aquatics Facility Study to address significant concerns at Rainbow Beach. The current facility suffers from an outdated design and poor condition, affecting visitor experience. Key recommendations include upgrading the bathhouse, introducing features like slides and zero-depth entry, enhancing shade structures, and incorporating new recreational activities. The study emphasizes the need for modern amenities and improvements to restore the beach's attractiveness to families and visitors.
E N D
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation
Concerns and Problems with Rainbow Beach • Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality. • Visitors are being lost to other venues. • The condition of the bathhouse is substandard. • Without shade, the oversized concrete pool deck is oppressive in the summer heat. • Pool mechanical system is antiquated and is past its life expectancy. • The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks. • Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes. • Maintaining chemical balance for this pool is difficult. • It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell. City of Vincennes – Aquatic Facility Study
Recommendations 1. Slides and / or Diving Boards 2. Play Apparatus / Structure for all ages 3. Zero Depth Entry 4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool 5. Upgraded Bathhouse 6. Improved Concessions 7. ADA Accessibility 8. Variety of Experiences – Water Basketball, Water Volleyball, Etc. 9. Shade Structures and Lounge Seating 10. Sound System and Wi-Fi 11. Planned Activities and Programs City of Vincennes – Aquatic Facility Study City of Vincennes – Aquatic Facility Study City of Vincennes – Aquatic Facility Study
Pool Amenities City of Vincennes – Aquatic Facility Study
Slides City of Vincennes – Aquatic Facility Study
Zero Depth Entry City of Vincennes – Aquatic Facility Study
Shade Structures City of Vincennes – Aquatic Facility Study
Play Apparatus City of Vincennes – Aquatic Facility Study
Spray Parks City of Vincennes – Aquatic Facility Study
Recreation/Competition Combination City of Vincennes – Aquatic Facility Study
Bathhouse, Locker Facilities and Party Facilities City of Vincennes – Aquatic Facility Study
Options for Rainbow Beach City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility • Description and Cost • Existing Recreation Pool and Bathhouse to Remain…………………….....................…....... • Remove existing Wadding Pool and Deck………………………………………………………….…. • Create New Splash Park………………………..…………………………………………………………… • Provide Associated Site Improvements…………………….…………………………………….….... • Shade Structures, Pavement, Fencing, Etc. • Contractor General Conditions/Overhead & Profit…………………………………………..……….. • Construction Range of Magnitude Budget………………..…………………………….….…….. • Add new deck around the existing pool…………………………………………………………….……. • 0 • 10,000 • 140,000 • 85,000 • 22,000 • 257,000 • ????? • $ • $ • $ • $ • $ • $ City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility • Description and Cost • Minor Renovations to Existing Bathhouse.……………….…......................................... • Renovation Existing 10 Lane 50 Meter Lap Pool………………....…………………............. • Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, • New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures……………….…………….………………………………………………..…......… • Provide New Water Slide…………………………………………………………………………....... • New Water Features/Play Apparatus……………………….………………………………...….. • Contractor General Conditions/Overhead & Profit.………………………………………..…. • Construction Range of Magnitude Budget……….………………………………….........… • $ • $ • $ • $ • $ • $ • $ • 100,000 • 1,800,000 • 810,000 • 175,000 • 165,000 • 305,000 • 3,355,000 • -$300,000 • -$3,480,000 City of Vincennes – Aquatic Facility Study
Option B.1: Renovation of the existing facility City of Vincennes – Aquatic Facility Study
Option B.1: Renovation of the existing facility • Description and Cost • Minor Renovations to Existing Bathhouse………………….…..................................... • Renovation Existing 10 Lane 50 Meter Lap Pool………………....…………………......... • Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, • New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures……………………………………………………………………………………... • Provide New Water Slide…………………………………………………………………………... • New Water Features/Play Apparatus.……………………………………………………….... • Add Spray Park and Associated Site Improvements………………………………………. • Contractor General Conditions/Overhead & Profit…………………………………..…… • Construction Range of Magnitude Budget………………………………………..…….… • $ • $ • $ • $ • $ • $ • $ • $ • 100,000 • 1,800,000 • 810,000 • 175,000 • 165,000 • 160,000 • 321,000 • 3,531,000 • -$300,000 • -$3,656,000 City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility • Description and Cost • Minor Renovations to Existing Bathhouse…………………………….…..................... • Create New Pool………………………………………………………………....……….......... • Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..………………... • Provide New Water Slide………………………………………………………..................... • New Water Features/Play Apparatus……………….…………………….………………... • Contractor General Conditions/Overhead & Profit………………….………............ • Construction Range of Magnitude Budget…………………………….................... • 100,000 • 1,250,000 • 740,000 • 175,000 • 165,000 • 243,000 • 2,673,000 • $ • $ • $ • $ • $ • $ • $ • -$300,000 • -$2,798,000 City of Vincennes – Aquatic Facility Study
Option C.1: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C.1: Construction of a replacement facility • Description and Cost • Minor Renovations to Existing Bathhouse…………………………….…..................... • Create New Pool………………………………………………………………....……………… • Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..……………….. • Provide New Water Slide………………………………………………………................... • New Water Features/Play Apparatus…..………………………………….……………….. • Add Spray Park and Associated Site Improvements…………………………………… • Contractor General Conditions/Overhead & Profit………………….………………… • Construction Range of Magnitude Budget…………………………….................... • $ • $ • $ • $ • $ • $ • $ • $ • 100,000 • 1,250,000 • 740,000 • 175,000 • 165,000 • 160,000 • 259,000 • 2,849,000 • -$300,000 • -$2,974,000 City of Vincennes – Aquatic Facility Study
Option C.2: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C.2: Construction of a replacement facility • Description and Cost • Minor Renovations to Existing Bathhouse…………………………….…............ • Create New Pool………………………………………………………………....……… • Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..……….. • Provide New Water Slide………………………………………………………........... • New Water Features/Play Apparatus…..………………………………….……….. • Add Spray Park and Associated Site Improvements………………………….. • Contractor General Conditions/Overhead & Profit………………….……….. • Construction Range of Magnitude Budget…………………………….......... • $ • $ • $ • $ • $ • $ • $ • $ • 100,000 • 2,300,000 • 810,000 • 175,000 • 165,000 • 160,000 • 371,000 • 4,081,000 • -$300,000 • -$4,206,000 City of Vincennes – Aquatic Facility Study
Option C.3: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C.3: Construction of a replacement facility • Description and Cost • Create New Pool………………………………………………………………....………… • Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, • Slide Well, New Pool Filtration & Chemical Systems, • Piping & Equipment • New Equipment Building, MEP, Pool Deck, Fencing & • Shade Structures, etc…………………………………………………………..………….. • Provide New Water Slide………………………………………………………............. • New Water Features/Play Apparatus………………..……………………………….. • Add Spray Park and Associated Site Improvements…………………………….. • Add New Bathhouse with Concessions………………………………………………. • Contractor General Conditions/Overhead & Profit………………….………….. • Construction Range of Magnitude Budget……………………………............. • 2,300,000 • 810,000 • 175,000 • 165,000 • 160,000 • 625,000 • 423,000 • 4,658,000 • $ • $ • $ • $ • $ • $ • $ • $ • -$300,000 • -$4,783,000 City of Vincennes – Aquatic Facility Study
Cost Comparison City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities City of Vincennes – Aquatic Facility Study