SP-RCC donor coordination meeting Renewable energies AFD-JICA-GTZ March 2010 Isabelle Vincent. Agenda. Implications of the power sector market reform on RE development Up-date on the approval of the RE Master Plan Implications for the SP-RCC matrix Coordination between donors’ initiatives

evelyn
Télécharger la présentation

SP-RCC donor coordination meeting Renewable energies AFD-JICA-GTZ March 2010 Isabelle Vincent

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SP-RCC donor coordination meeting Renewable energies AFD-JICA-GTZ March 2010 Isabelle Vincent

  2. Agenda • Implications of the power sector market reform on RE development • Up-date on the approval of the RE Master Plan • Implications for the SP-RCC matrix • Coordination between donors’ initiatives • Discussions on specifc on-going initiatives by different donors

  3. 2. Up-date on the RE MP : background • RE MP : 4 scenarios • Scenario 1 : economic quantity of grid connected RE + 100% electrification by 2025, solar water heaters, improved cookstoves, biogas • Scenario 2 : scenario 1 but 100% electrification by 2020 • Scenario 3 : scenario 1 + wind power • Scenario 4 : scenario 1 + all identified grid connected renewables • Presentation by MOIT 14/01/2010 : subsidy for bagasse co-gen, geothermal, wind

  4. 2. Status of the RE MP • Has not been approved yet by Prime Minister • Concerns about the burden that the subsidy represents for consumers -> financing schemes have to explore other options than the option currently favoured by the MP ie levy on electricity bills. Question : consequences of a portfolio based approach on the financing scheme ? • Proposition of letter to MOIT & MONRE to involve donors into the consultation process

  5. 3. Implications for the RE matrix Outcome/Target CY2009 Actions (1st Cycle) CY2010 Actions(2nd Cycle) CY2011 Actions(3rd Cycle) • Achieve 3 % of renewable energy and new energy of primary energy consumption by 2010 (about 5% in 2020 and 11% in 2050) • Formulate Strategy and Master plan for Renewable Energy Development (2015-2025) • Finalize the draft Decree on encouraging and supporting REdevelopment • Conduct a study how to finance additional costs of renewable energy via Renewable Energy Fund • Establish Renewable Energy Fund as stipulated in the RE MP • Develop further legal framework related to RE development • Conduct survey related to the number of communes and households which need electricity and forumulate MP for rural electrification • Develop bio-fuel as analternative to partially replace conventional fossil fuels • Conduct social and environmental impact assessment of bio-diesel development in 2 or 3 provinces

  6. 3. Implications for the RE matrix : basis for discussion with MOIT Outcome/Target CY2009 Actions (1st Cycle) CY2010 Actions(2nd Cycle) CY2011 Actions(3rd Cycle) • Achieve 3 % of renewable energy and new energy of primary energy consumption by 2010 (about 5% in 2020 and 11% in 2050) • Formulate Strategy and Master plan for Renewable Energy Development (2015-2025) • Set a target for RE share in electricity generation • Finalize the draft Decree on encouraging and supporting REdev. • Conduct a study how to finance additional costs of RE • [To be discussed according to progress of 2nd cycle action ] • Conduct survey related to the nb of communes and households which need electricity and forumulate MP for rural electrification • Develop bio-fuel as analternative to partially replace conventional fossil fuels • Conduct social and environmental impact assessment of bio-diesel development in 2 or 3 provinces

  7. 4. Coordination in the RE sector

  8. 5. Up-date on specific initiatives • AFD’s technical assistance within SP-RCC • DFID – WB studies related to low carbon growth • ADB support process to the SEA of PDP 7th

  9. Thank you for your participation !