EEA and Norway Grants Programme risk management

EEA and Norway Grants Programme risk management. Inger K. Stoll , Head of Communication, Reporting and Evaluation, Financial Mechanism Office March 2013. Results and risks. What is Results Based Management (RBM)

fergus
Télécharger la présentation

EEA and Norway Grants Programme risk management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EEA and Norway Grants Programme risk management Inger K. Stoll, Head of Communication, Reporting and Evaluation, Financial Mechanism Office March 2013

  2. Results and risks What is Results Based Management (RBM) RBM is a management strategy by which all actors, contributing directly or indirectly to achieving a set of results, ensure that their processes, products and services contribute to the achievement of desired results (outputs, outcomes and impact) What is a result and a risk? In the context of the Grants: A result is the output, outcome or impact of a development intervention A risk is an event that may occur and impede the objective

  3. KEY CONCEPTS Results achievement Beneficiary oriented Managing for results and reduced risks

  4. Risks • Risks are an expression of uncertainty • Risks are events that may occur, and if they occur, have harmful or negative effects on the achievement of results • Risks are closely related to the results and should consequently be analysed against the results framework of a programme • Risk analyses strengthen the basis for choosing realistic objectives and level of ambitions

  5. Risk management process in 11 steps Establish strategy and processes • Develop a strategy for integrating risk management in results management • Establish risk leadership integrated in results management Analysis, actions and follow-up on several levels 3. Identify objectives 4. Identify critical success factors (assumptions)

  6. Risk management process in 11steps 5. Identify risks 6. Assess and prioritise the risks, in terms of likelihood and consequence; high – medium – low 7. Decide risk tolerance 8. Define and assess risk response 9. Response to residual risk

  7. 10. Mitigate and manage risks 11. Dialogue and Report FMO’s risk management strategy : http://www.eeagrants.org/

  8. Risk management levels Risk strategy at each level, according to roles and responsibilities Programme Total Grants Country Projects

  9. Steps 1 & 2: Establish risk strategy and leadership • Risk management system in place • Programme Operator must actively take leadership at programme and project levels • Assign roles at each level • Also keep an eye on national level risks, and mitigate where possible

  10. Step 3: Identify objectivesat all levels, example

  11. Step 3. Identify objectives at all levels Example – Renewable Energy Objective (pre-defined) Expected outcome(s) (pre-defined) Outputs Types of projects • Modernised RES infrastructure • R&D on RES • Feasibility of RES mapped out in relation to local conditions • Windmills • Solar systems • Hydropower • Bioenergy • Training in RES planning competence • Plans/policy development • Awareness raising campaigns at local level • Train the trainers • Training courses for officials at regional level • Training courses for officials at regional level

  12. Step 4: Identify assumptions • Assumptions are the necessary positive conditions that allow for a succesful cause-and-effect relationship between the different levels of results. • Assumptions are critical success factors. • Assumptions are formulated after the objectives, to ensure results chain realism

  13. Step 4: Identify assumptionsat all levels

  14. Step 4: AssumptionsAn example • Outcome: Participation in local election increases from 63% in 2012 to 75% in 2016. • Output: Votersregistrationincreases from 70% in 2012 to 90% in 2016. • Assumption: Votingcentresareoperational and in place on votingday.

  15. Step 5: Identify risks • Risk identification is done in all phases of a programme, but early identification gives the best effect. • Normally requires several contributers. • If a critical assumption is likely to occur but not certain, it may represent a risk. • Risks are expressed as negative statements in relation to achievement of the desired result.

  16. Step 5. Risk identification • Identifythe risk, monitor, manage and try to influence. A risk register can be useful. • Theremight be a perceivedconflictofinterestregardingsharinginformationof risks. • Keep in mind: Alwaysdocumentyour risk identification, analysis and mitigation

  17. Identification of a riskAn example

  18. Risk categories It is common to group the risks incategories. FMO usesninebroad risk categories: • Policy and politics • Governance: Institutional, management, transparency and accountability • Corruption and procurementissues • Socio-cultural and gender equity, minorities, Roma, rights and values

  19. Risk categories • Financial issues • Economicissues • Environmental and climateissues • Technical and technologicalissues • RoleofDPPs and project partners NB – Other risk categoriesarealso relevant

  20. Risk dimensions Each risk categoryconsistsofcertain risk dimensionsExampleGovernancecategory: • Adequatecompetence and capacity is not available • Supportive legal frameworkconditionsare not in place • The control systems are not sufficient

  21. Step 6: Assess and prioritisethe risks A risk analysiscontains an assessmentofthe risks in terms of • Probability or likelihoodoftheoccurenceofthe risks • Consequences or impactiftheeventoccurs The risk assessment is a forward-lookingexercise; it shouldtakeintoaccountthe whole agreementperiod- and beyond- to ensuresustainabilityoftheresults

  22. Risk probability and consequence

  23. Risk Analysis High Probability Medium Low High Low Medium Consequence

  24. Narrative risk summary • The risk rating is accompanied by a narrative assessmenthighlightingthe major risks identified. • All thehigh or substantial risk ratingsarenamed as major risks Keep in mind: Distinguishprobability and consequence

  25. Step 7: Risk tolerance levels Risks are inevitable. It is not an aim to avoid risks at all costs. A higher risk may be acceptable in contexts where the expected impact and benefits are higher than the potential risks.

  26. 7. Risk tolerance • Decide and document what level of risk you accept • Communicate the risk appetite

  27. 8. Define and assessrisk response • Identify mitigating actions (including conrols) and assess their impact • Decide on mitigating actions • Re-assess to conclude on residual risk

  28. Step 9: Response to residual risk • Decisionsregardingtoleranceofmajor residual riskscan be divided in thefolllowingstrategies: • Avoid/terminate: Redesign programme or terminatetheprogramme or parts of it. • Transfer/share: Share risk withother partners (ex DPPs) or pass theimpactofthe risk to third part (e.g. via an insurance policy)

  29. 9. Response to residual risk… • Accept/tolerate: Accept the risks withoutanymitigatingactions, but monitor and manage if the risk levelincreases

  30. Step 10: Mitigate and manage risks • Reduce, prevent, mitigate • Establish a system for risk monitoring and handling. • During implementation it is good practice to incorporate the mitigating measures in the regular work plan of the programme or projects, assign staff members responsible for actions and resources required.

  31. Mitigation and management • Assess the implementation progress of the mitigating measures, manage and report. • Identify any new risks or changes in circumstances and add to your risk registry and work plan. • Sometimes we need to redesign our risk mitigation strategy and actions.

  32. Risk mitigation

  33. Step 11:Reporting and dialogue • The programme risk management will be reported in the Annual Programme Report and in the NFP’s Annual Strategic Report • The risk picture and the possible mitigating actions will be a central element in the dialogue between donors, beneficiaries and the FMO

  34. Risks to achievment of outcomes • At the programme level, the FMO bases its risk assessment on the Programme Proposal, the Annual Programme Report the Annual Strategic Report from the NFP and the dialogue. EU analyses are also used. • The FMO especially focuses on likelihood and consequence of risks to achievement of the outcomes = output to outcome review

  35. Results for the beneficiaries • Weareinterested in achievingresults for thebeneficiaries, e g thehigherlevelobjectives, and correspondinglyinterested in thehigherlevel risks Weare in it together!