1 / 20

CHP Power in India & Status of Legislation for Funding

CHP Power in India & Status of Legislation for Funding. By R V Nesari. Power Scenario in India. Total Installed capacity: 126,176 MW (at the end 2005-06) Gross Generation : 635 BUs Per capita consumption: 606 kWh/ year Electricity shortage : about 7% Peaking shortage : about 13 %.

gada
Télécharger la présentation

CHP Power in India & Status of Legislation for Funding

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHP Power in India & Status of Legislation for Funding By R V Nesari

  2. Power Scenario in India • Total Installed capacity: 126,176 MW (at the end 2005-06) • Gross Generation : 635 BUs • Per capita consumption: 606 kWh/ year • Electricity shortage : about 7% • Peaking shortage : about 13 %

  3. Power Mix in IndiaTotal Installed capacity: 126,076 MW

  4. Projections for Installed Capacity 2006-07 : 140,500 MW 2011-12 : 197,060 MW 2016-17 : 276,385 MW 2021- 22 : 387,645 MW 2026-27 : 543,690 MW 2031-32 : 762,555 MW

  5. Potential & Actual Installed Capacity of Renewable Sources (incl. Cogeneration)

  6. Achievements of Biomass Power/Cogeneration(as on 30.06.2003) Source: MNES

  7. Potential for CHP in IndiaSource:Paper for UNIDO Expert Group Meeting by Mr. S. C. Natu, MITCON (Dec.1999)

  8. Potential for Bagasse based Cogeneration(Source: MNES)

  9. Policy Reforms in Power Sector Highlights of Electricity Act 2003- came into force from 10th June 2003: • Provided liberal framework for power sector development by ensuring a competitive environment. • Facilitated in unbundling of power sector. • First major statute providing promotion of non-conventional energy sources including cogeneration.

  10. Electricity Act-2003(Provisions related to Cogeneration) Sec.3: Central Govt. to prepare National Electricity Policy and Tariff policy for optimal utilization of all resources of power generation including Non-conventional. Sec.4: Central Govt. to prepare National Policy for standalone system for rural areas including those based on non-conventional sources of energy. Sec.61 (h): The appropriate commission to specify the terms and conditions for determination of tariff and it shall be guided by: • The promotion of cogeneration and generation of electricity from renewable sources of energy.

  11. Electricity Act-2003(Provisions related to Cogeneration) contd.. Sec. 86 (1) (e): The state commission shall • Promote cogeneration and generation of electricity from renewable sources by providing suitable measures for connectivity with the grid; • Sale of electricity to any person and • Also specify for purchase of electricity from such sources, a percentage of the total consumption of electricity in the area of a distribution licensee.

  12. National Electricity Policy 2005 Regarding NCES, the policy states: • Being environment friendly, needs urgent promotion. • Efforts to reduce capital cost by promoting competition in such projects. • State Electricity Regulatory Commissions (SERCs) to fix a percentage of the total consumption in the area of a distribution licensee and this share to increase progressively. • Purchase of NCES power by distribution companies by competitive bidding.

  13. National Electricity Policy 2005 (contd.) • Industries with need of heat and power are well suited for cogeneration. • Significant potential for cogeneration in the country particularly in Sugar Industry. • SERCs to promote arrangements between the co-generator and the concerned distribution licensee for purchase of surplus power from such plants. • Cogeneration system needs encouragement in the overall interest of energy efficiency and also grid stability.

  14. National Electricity Policy 2005Financing Power Sector programmes • To meet the objective of rapid economic growth and ‘power for all”, a sizeable part of investments from private sector required. • The Act provides a conducive environment for investments in all segments of the power industry by removing barrier to entry in different segments. • Participation of suppliers on competitive basis encouraging private investment. • Return on Investment on the capital of private sector should be at par with investment opportunities in other sectors.

  15. National Electricity Policy 2005 (contd..) • Central and the State Governments need to develop workable and successful models for public-private partnership. • Mechanism for streamlining procedures for encouraging private participation in power sector.

  16. Investment Policy • Foreign Investors (FI) can enter into a JV with an Indian partner for financial and /or technical collaboration and setting up of NCES based power generation projects. • Liberalized foreign investment approval regime to facilitate foreign investment and transfer of technology through joint ventures. • The proposals for up to 74% foreign equity participation in a JV qualifies automatic approval. • 100% foreign investment as equity is permissible with approval of Foreign Investment Promotion Board (FIPB).

  17. Fiscal Incentives and FacilitiesTo Manufacturers and users of NCES Systems (contd..) • Facility for Banking and wheeling of power • Facility for Third Party sale of power from NCES. • Financial incentives/ subsidies.

  18. State Government Policy • A set of guidelines issued by MNES for consideration of States. • A number of States announced policy packages including wheeling, banking, Third Party Sale and Buy-back. • Some states provide concession/exemption in State Sales Tax and Octroi duty etc.

  19. Investment Policy (contd..) • Various Chambers of Commerce and Industry Associations in India can be approached for guidance to Foreign Investors in finding appropriate partners. • Govt. of India encourages FI to set up renewable energy based generation projects on Built-Own and Operate basis.

  20. Fiscal Incentives and FacilitiesTo Manufacturers and users of NCES Systems • 100% accelerated depreciation for tax purpose in the first year. • No excise duty on manufacture of most of the finished goods. • Low import tariffs on capital equipment and most of materials and components. • Soft loans to manufacturers and users. • Five Year tax holiday. • Remunerative price under alternate power purchase policy by State Govt. for power fed to the grid.

More Related