Preparation of an inspection plan: The Dutch approach

grant avatar
13 diapositives · 279 Views · Aug 24, 2014

This document outlines the Dutch method for preparing an inspection plan for major hazardous establishments following the new Council Directive. It emphasizes the importance of periodical inspections, safety report verification, and effective management system evaluations. The approach includes six key steps: preparation, checking prevention policies, engaging in dialogue with management, inspecting safety management systems, assessing findings, and notifying establishments. Key issues such as risk identification, operational control, and emergency planning are addressed, ensuring compliance and enhancing safety.

Preparation of an inspection plan: The Dutch approach - slide 1
01 / 13Preparation of an inspection plan: The Dutch approach
1 / 17

Télécharger la présentation

Preparation of an inspection plan: The Dutch approach
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Preparation of an inspection plan:The Dutch approach • Theo de Gelder • Senior Inspector • Regional Inspectorate South-West • Dutch Ministry of Environment Bratislava april 2003

  2. Requirements of the new Council Directive • A periodical inspection of major hazardous establishments • A thoroughly verification of safety reports and management systems • Preparation of an inspection plan in advance • Case: the Dutch method based on NIVRIM Bratislava april 2003

  3. Criteria and use of an inspection plan • Checklist with attention points • The prevention policy complies with the Decree • The implementation of hazard risk control is present and adequate • The human reliability of safety improvement and output • Use the issues of a management systems Bratislava april 2003

  4. The issues of a safety management system • Organisation and personnel • Identification and evaluation of major hazards • Operational control • Management of change • Planning for emergencies • monitoring and performance • Audits en review Bratislava april 2003

  5. The issues of a safety management system • Based on Seveso Directive • NIVRIM approach checks these issues ( correct ? , presence ? Complete ? ) • Very useful for the inspection team Bratislava april 2003

  6. The 6 steps of the inspection plan • 1. Preparation of the inspection plan • 2. Check of the accident prevention policy document • 3. An open dialogue with the direction of the establishment in order to verify the prevention policy • 4. Investigation of the 7 mentioned elements by interviews of personnel and site inspection. Search for evidence and effectiveness on the work floor • 5. Assessment of findings and formulation of recommendations • 6. Round up of the results and notification Bratislava april 2003

  7. Step 1: Preparation • Inventory of the diversity of the hazardous materials (chemistry and physics) • Go into details of processes and equipment • Age of site and equipment • Check effects in case of fire, explosion etc. • Awareness of exposed persons and physical situation • History and reputation Bratislava april 2003

  8. Step 2: Check of the prevention and policy documents • Policy goals • Task and responsibilities • Evaluation of the major hazard risks • Available means • Implementation evaluation plans and policies • Communication Bratislava april 2003

  9. Step 3: verification and dialogue with management • Goal: insight overall picture • Commitment major concern • Motivation policy documents (present or absent) • Specific issues dialogue should be addressed • Interaction other (management) systems Bratislava april 2003

  10. Step 4: Inspection of the safety management system • SMS check is crucial • Presence, complete, just • Implementation and effectiveness on all levels • Evaluation of the situation • Ranking: Absent - -, Weak -, Reasonable - +, Present + Bratislava april 2003

  11. Step 5: Asessment of findings and recommendations • Data: quality picture safety management system • Advice: introduction “quality loops” to check adequacy of the SMS • Special attention points • Safety improvement and output human reliability Bratislava april 2003

  12. Step 6: Notification to the establisment • Dutch approach requires a formal notification with findings • Important: follow up, • Appointments • Cooperation involved parties • Systematic monitoring Bratislava april 2003

  13. Final individual conclusion and remarks • Implementation of SMS: a must • Inspections and audits SMS’s a new task • A new tool : challenge and insight • Useful for physical planning in future • Support and feed back by other EU members • Transfer of knowledge • Learning by doing • Win- win situations • Competitive within the EU • If there is a will there will be a way !!! Bratislava april 2003