1 / 4

Vertical Test Stand Update

Vertical Test Stand Update. C.M. Ginsburg For the VTS group. VTS Cryostat Procurement. Currently in Procurement Department Ron Evans, buyer Send out to vendors by end of week Ability Engineering (South Holland, IL), American Magnetics (Oak Ridge, TN), Cryofab (Kenilworth, NJ)

gyala
Télécharger la présentation

Vertical Test Stand Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Vertical Test Stand Update C.M. Ginsburg For the VTS group C.M.Ginsburg ILC/SRF R&D mtg

  2. VTS Cryostat Procurement • Currently in Procurement Department • Ron Evans, buyer • Send out to vendors by end of week • Ability Engineering (South Holland, IL), • American Magnetics (Oak Ridge, TN), • Cryofab (Kenilworth, NJ) • Cryogenic Plants and Services (Linde), (Tulsa, OK) • CVPI (Emmaus, PA) • Meyer Tool (Oak Lawn, IL) • PHPK (Columbus, OH), • xyz company (WI) • 3 weeks for vendors to respond • 1 week for bid evaluation • Award contract September • Funds already allocated, so $$ “spent” in FY06 C.M.Ginsburg ILC/SRF R&D mtg

  3. Assorted VTS News Items • Aseet Mukherjee is designing a thermometry system for 9-cell cavities • R&D underway; plan cryo test of cheaper thermometers in ICB (help from E. Barzi) • Andrei Lunin made preliminary RF design for a VTS input coupler • Will prepare some plots showing operational range in terms of measurement quantities, then mechanical design • Fixed input coupler for VTS commissioning, then variable coupler (2nd top plate) for future flexibility • Valeri Poloubotko to design the radiation shielding lid mechanical design and motion control system • Final design requires one more iteration with Igor Rakhno to include final civil construction detail drawings C.M.Ginsburg ILC/SRF R&D mtg

  4. Elsa: “But Mommy, why are you working on a hole?” VTS Civil Construction Complete labyrinthine instrumentation trench recessed area vertical pit August 2, 2006 C.M.Ginsburg ILC/SRF R&D mtg

More Related