An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E-Tagging Issues Work Group Albuquerque, NM Jan. 19, 2005 Raymond R. Vojdani, P.E.

  2. E-Tagging Issues Work Group ISSUES

  3. E-Tagging Issue Work Group • Bad Bad Bad Tags Complaint • Letter Response to a Marketing Entity • Response to a Question on BP #7 Tagging Issue (Single SE) • Reserve Obligation for the E-tags with Exchange Energy Product Code • E-Tagging Templates

  4. E-Tagging Issues Work Group • Issue 1: • Control Area A issues 3 tags, going through 3 intermediary CAs (B,C, and D) sinking in Control Area E. • All involved CAs and TPs approved these tags • The problem was that Sink Control Area and two intermediary CAs did not have the schedules in their Net Schedule Interchange • This becomes a ATF nightmare

  5. E-Tagging Issues Work Group Control Area B Source CA Control Area C Control Area D Sink Control Area

  6. E-Tagging Issues Work Group • We identified problems with processing E-tag in control area D and the Sink control area • Control Area D approved these tags as TP, but, since they were missing as Scheduling Entities, they didn’t have these tags in their Net Interchange • The Sink CA approved these tags as CA, but, didn’t included these tags because they were not the TP on these tags.

  7. E-Tagging Issues Work Group • Resolution Status: • Sink CA agreed to enter these tags in their Net Interchange and take the inadvertent. Also, Sink CA worked with their E-tag vendor to modify their e-tag processing to eliminate future problems. Control Area D also worked with their E-tag vendor to modify their e-tag processing to eliminate future problems.

  8. E-Tagging Issues Work Group • Issue 2: • This was not really an Issue, but, to write a response letter to a marketing entity. • The letter was sent to the former OC Chair (Rod Maslowski) after his Nov. 12, 2004, memo. • ISAS Chair directed this WG to draft a response • We had a lot of discussions, and went through many iterations before we agreed on the language of the response letter • Resolution Status: We e-mailed the letter to the PSE.

  9. E-Tagging Issues Work Group • Issue 3: • A PSE had a concern about BP #7 implementation • This PSE is an Agent for Another PSE. • They were hoping that they can list themselves as SE in the tags • The current E-tag version, only allows TPs or CAs to be SE • This was not a shortcoming in BP#7 • Resolution Status: A couple of options were provided to this PSE. 1 - To work with their E-tag vendor to see if they can see both PSEs tag in one login. 2 – Enter themselves for every tag that they are writing for their agent

  10. E-Tagging Issues Work Group • Issue 4: • A PSE who is involved in Exchange Energy Transaction, wants to know what is his reserve obligations based on the current rules. • Reserve obligation for non-firm imports is 100%, but, for unit contingent is different. • Resolution Status: Still under consideration. One possible response is to treat this as GF-C and carry reserve as it is required.

  11. E-Tagging Issues Work Group • E-Tagging Templates: • Issues & Driving Force Behind it • There will be Grouped into 4 Regions • Rocky Mountain • Desert Southwest • Northwest • California • Where Would these Template Reside • WECC ISAS Website • Common Western OASIS (webttrans.net) • Future Use: WIT

  12. E-Tagging Issues Work Group • Send your issues to Raymond Vojdani: avojdani@wapa.gov Or, call (970) 461-7379 • Please CC Bob Schwermann: BSchwer@smud.org

  13. E-Tagging Issues Work Group Questions?

  14. Real 9-1-1 Call > Dispatcher: 9-1-1 What's the nature of your emergency? > Caller: My wife is pregnant and her contractions are only two minutes apart. > Dispatcher: Is this her first child? > Caller: No, you idiot! This is her husband!

  15. Real 9-1-1 Calls >Dispatcher: 9-1-1 > Caller: Yeah, I'm having trouble breathing. I'm all out of breath. Damn....I think I'm going to pass out. > Dispatcher: Sir, where are you calling from? > Caller: I'm at a pay phone. North and Foster. > Dispatcher: Sir, an ambulance is on the way. Are you an asthmatic? > Caller: No > Dispatcher: What were you doing before you started having trouble breathing? > Caller: Running from the Police.