Country Estates

Final Report. Country Estates. PARAGON. Project Team. Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda Sheehe – Project Editor. Project Description Design Requirements Project Approach Work Completed Projected Work. Project Description.

helmut
Télécharger la présentation

Country Estates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Report Country Estates PARAGON

  2. Project Team • Mike Reeves – Project Manager • Cole Marr – Project Engineer • Bryce Beckstrom – Project Engineer • Amanda Sheehe – Project Editor

  3. Project DescriptionDesign RequirementsProject ApproachWork Completed Projected Work

  4. Project Description

  5. Project Description • 66 Acres • 22 Estate Size Homes • 1-2 Acre Lots • ± 33 Acre Community Space • High Efficiency • Low Environmental Impact

  6. Existing Site Proposed Development

  7. Design Requirements Objectives • Develop 3 Wastewater Treatment Options • Develop Stormwater Management Plan • Incorporate Greywater Treatment and Reuse • Wetland Habitat Area • Community Recycling Program • Design Trail Around Site

  8. Preliminary Feasibility Study • Location • Zoning • Utilities • Transportation • Site Characteristics

  9. Environmental Site Assessment • Site Reconnaissance • Current and Past Use • Tax Information • Other Concerns • Interviews • Josh Reed – Property Owner • Hancock County Assessor’s Office

  10. Codes & Regulations Regulation Entities • Hancock County • Conservation Subdivision • IDNR • LEED • 10 State Standards • AASHTO

  11. LID Design Options

  12. Preliminary Site Plan • Designed According to Hancock County • Will Meet R-1 Zoning • 1-2 Acre Lots for Adequate Septic

  13. Preliminary Site Plan • In Contact with Mike Dale - Planning Dept • Use Natural Lay of Land to Reduce Cut and Fill in Roadway • Roundabout Designed to Standards (TFHDC)

  14. Geotechnical Analysis • Wildcat Dynamic Cone Penatrometer • Tube Samples (6” &3’)

  15. Laboratory Analysis of Samples • Unconfined Compression Test (ASTM D2166) • Atterberg Limits (ASTM D4318) • Particle Size Analysis (ASTM D422)

  16. Assessment of Wastewater Options • 3 Options Considered Conventional Septic System Presby Treatment System Wetlands Treatment

  17. Assessment of Wastewater Options • Decision Matrix Criteria • Decision Matrix Results

  18. Hydraulics and Hydrology • Design for 100-yr flood • Route stormwater through wetlands • Size pipes to control flooding • Design water quality trenches • Promote natural overland flow Existing vs Proposed 100-year Storm Routing

  19. Wetlands • Treat 170 acres • Design wet pond to allow for sediment settling/quality volume • Research vegetation for the wetlands • Design outlet structure that controls 100-year flood

  20. Erosion Control Plan • Minimize sediment runoff into Miller Ditch • Minimize cut and fill on-site: 680cy cut • Reduce soil that leave site via truck tires

  21. LID/Conservation Highlights • 50% Community Space • 20 Lots front community space • Enviro-Septic Wastewater Treatment • Density meets maximum requirement

  22. Highlights • 22 Lots, 1-2 Acres Each • Site Layout/Roadway Design • Sustainable LID Designs for: Wastewater Greywater Stormwater • $440,000 Cost Estimates for Design/Construction/Lifecycle