1 / 12

TPC Status

TPC Status. Pre-Commissioning. Phase 1 results see Oct Forum Phase 2 (till Nov 19): ‘endurance test’ for sectors, 2 days, 2 at a time Finalized cabling Better known gas composition Full DCS functionality: monitoring and storing of parameters (i.e. FEE temperatures)

hung
Télécharger la présentation

TPC Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TPC Status TB 07.11.06 Peter Glässel, Heidelberg

  2. Pre-Commissioning • Phase 1 results see Oct Forum • Phase 2 (till Nov 19): • ‘endurance test’ for sectors, 2 days, 2 at a time • Finalized cabling • Better known gas composition • Full DCS functionality: monitoring and storing of parameters (i.e. FEE temperatures) • ISEG HV: monitoring currents • Prepare sectors for transport • 2/3 done Sector covers (cooled) TB 07.11.06 Peter Glässel, Heidelberg

  3. Main results in phase 2 • FEE life: no single failure • Gain curves, gain margin A-side • HV trips: • Only seen with ISEG: fast hardware trip • Mainly seen for OROCs • regardless of trip current settings • No clear correlation with HV, time (conditioning?) • Modify time constant: with 15 M series resistor only one trip since 5 days on C-side • Gain spikes (high gain on a pad row): go away with time TB 07.11.06 Peter Glässel, Heidelberg

  4. Summary – IROC S/N Measurements not available TB 07.11.06 Peter Glässel, Heidelberg

  5. Summary – IROC S/N Measurements not available TB 07.11.06 Peter Glässel, Heidelberg

  6. Summary – OROC S/N Measurements not available TB 07.11.06 Peter Glässel, Heidelberg

  7. Summary – OROC S/N Measurements not available TB 07.11.06 Peter Glässel, Heidelberg

  8. SECTOR A00 gain curves A00 - Gain TB 07.11.06 Peter Glässel, Heidelberg

  9. OROC A00 exchange • Wire broken • 150 V below max HV tested • Decision to exchange OROC • Preparations in parallel to phase 2 commissioning C-side: remove electronics (1 sector only), cabling, FEE frames • Yellow platform in non-standard asymmetric fashion (keep I-bars on A-side) • Re-test spare OROC before exchange • Time schedule till end Nov: 10 days delay TB 07.11.06 Peter Glässel, Heidelberg

  10. TPC transport to UX2 • Technical questions for transport resolved • Transport document http://www.physi.uni-heidelberg.de/~glassel/TPC/TPC-transport/TPC-transport.pdf • Except maybe weather: T < 10 deg? • Preparations start late Nov, actual transport 4.12.? • Last minute technical problem for installation: • Connection rails are incompatible with BSF • need to be modified, redesign done, calculations pending • Critical part taking large forces (5.5 t vertical) • Load test needed • Have to be in place before transport: time schedule risk TB 07.11.06 Peter Glässel, Heidelberg

  11. Spares, reference • Complete A-side phase 2 summary under https://webh06.cern.ch/alice-tpc-commissioning/documents/TPC_2nd_phase_summaryAside.ppt TB 07.11.06 Peter Glässel, Heidelberg

  12. OROC A00 pulser readout after wire broke A00 / OROC with broken wire(s) Signal injected into cathode wires 4 FECs had several channels damaged TB 07.11.06 Peter Glässel, Heidelberg

More Related