An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. State of the ProjectSHARELIFE Delft, April 29th 2008 (Mathis Schröder)

  2. Agenda • Timeline: detailed schedule • Translation and Certification • Country pilot feedback • Country pilot results

  3. Tasks and Timetable(from March 2007) • Phase 1: First Pre-Test by December 2007 First survey draft: finished in July 2007 Programming: finished in September 2007 1st pilot : finished successfully in September/October 2007 2nd pilot: not in the field in January 2008, “in-house” testing • Phase 2: Main Survey ready by November 2008 survey revision and translation for country pilots: March 2008 country pre-testing: July 2008 • Phase 3: “First Results” by December 2009 data collection finished: June 2009 cleaning and first evaluation: November 2009

  4. Timeline – Pre-Test • Translations (LMU open): • Version 3.5 (changes from pilot): May 2nd to May 9th • Version 3.6 (pre-test version): May 16th to May 23rd • SMS/CAPI versions scheduled release: • Version 3.5 (generic): May 6th -> feedback until May 12th • Version 3.5 (country): May 16th (Translation!) • Version 3.6 (generic): May 16th • Version 3.6 (country): May 30th (Translation!) • SMS Server: • First version released May 9th • Final generic version May 16th

  5. Timeline – Pre-Test • Fieldwork material: • SRC prepares • To be delivered by May 13th • Preload database: • Prepared by MEA by May 16th • Checked by Agencies until pre-test starts in June • TTT: • Server SMS: May 19th, Frankfurt Airport, 10:30-16:00 • Make sure Survey Agencies know! • May 27th-29th in Mannheim

  6. Timeline – Pre-Test • Pre-Test Field Duration: • National Training Sessions (NTS) from June 2nd to 13th • Deliver Data by July 18th (50 days after TTT) • After the pre-test… • Evaluation of pre-test results in August • Edesheim 21./22.8. • Translate the changes to final version • TTT September 23rd – 26th in Mannheim • Main Field Duration: • Start in October/November 2008 • Be finished by March/April 2009

  7. Translation

  8. Adaptation • Certification • Done externally by cApStAn • Received a subset of the translated questions • Evaluate adaptations using the generic questionnaire • 14 Items in the first round, for all countries • Based on first round results, second round with 11 Items • 5 out of 10 versions went into second round • Overall, some flaws were found, some questioning the comparability of the questions across countries • For the LMU 3.5, each country will receive the results of the certification separately tomorrow (4-30)

  9. Pilot - Feedback • Thanks to all CTLs for providing feedback! • The interviewer feedback is mainly positive • Interview enjoyable • Almost no technical breakdowns • Flexible modules order was not used • Corrections were made via the calendar • The search tool is not used…

  10. Length by Country

  11. Length by Region

  12. Length by Module

  13. Accommodation

  14. Work

  15. Age

  16. Length Summary • We are overall OK in terms of time • What happened in Denmark? • Some quick stats: 2% > 2.5 h 4% > 2 h 15% > 1.5 h 26% < 45 min 3% < 30 min • But: still add CV and Grip Strength

  17. And what now…? • Cuts or changes have already been made in the… • AC module: moves starting at age 10 • RE module: some questions out, clarified others (ISCO) • HS module: deleted some questions, combined others • HC module: major cuts in the loops for preventive care • RC module: cut the stillbirths and abortion loop • RP module: improved the marriage section • Addition in the GL-module on persecution • Thanks to Radim and Michal for pointing this out • One general filter and then some follow up questions

  18. And what now…? Thanks!