This assembly update, presented by Matt Hoff at LBNL, outlines the process of attaching a vertical vane to the U-brackets during fabrication. The update details the installation of two vanes and the integration of modulation protection foam. Key components such as adjustable tuners and braze clamps are highlighted. The assembly frame is modified, with temporary joint plates used. Observations include the positioning of adjustable tuners and the installation of a Pi-mode rod within the setup, essential for ensuring precision in the assembly process.

ivan-dudley
Télécharger la présentation

Assembly Update on Vertical Vane Attaching to U-Brackets - LBNL (April 3, 2014)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PXIE Module 2 Assembly Update Matt Hoff LBNL April 3, 2014

  2. Attaching a vertical vane to the U-brackets. Adrian Kyle U-bracket during fabrication

  3. Two vanes in place Modulation protection foam

  4. All four vane brought together for the first time

  5. Adjustable tuners and braze clamps added

  6. Assembly frame removed from three sides

  7. Temporary joint plate Looking down stream. Note the adjustable tuners (all the way in) and a single Pi-mode rod.

  8. Adjustable tuning end plate Outside, adjustable tuner mechanism Inside, note the adjustable tuner disc