Status of the Focus Coil Magnet Procurement

Status of the Focus Coil Magnet Procurement. MICE Collaboration Meeting 25 th June 2012. Tom Bradshaw John Cobb Wing Lau Matt Hills. Elwyn Baynham Mike Courthold Victoria Bayliss Victoria Blackmore Jason Tarrant etc. Introduction.

jamil
Télécharger la présentation

Status of the Focus Coil Magnet Procurement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the Focus Coil Magnet Procurement MICE Collaboration Meeting 25th June 2012 Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss Victoria Blackmore Jason Tarrant etc...

  2. Introduction Talk will cover: Recent progress at TESLA, Configuration and Schedule

  3. Recent Progress and Status • Radiation shields fitted • Cold mass installed • Cold mass sensor wiring complete • Supports tensioned • Alignment of cold mass completed

  4. Alignment of Cold Mass Picture shows the space for the installation of the force transducers for accurate tensioning of the straps. We will monitor these during cool-down – the straps will contract by ~1.26mm Jig for installing force transducer Dummy force transducer shown in position

  5. Pre-stress of suspension Strap 1 0.51 Mid link 0.05 Strap 2 0.64 OVC link 0.06 Reduction in force due to OVC and foot deformation of 0.17mm Getting ~200kN from stress on cooldown which means that only a minimum room temperature pre-stress is required. This will be monitored during cool-down.

  6. Alignment of Cold Mass Wing and Jason witnessed the alignment and strap tensioning on the 18th. Cold mass accurately centred Worryingly, the position of the flange hole centres is +/- 0.7mm on best fit pitch circle diameter which is out of tolerance. Best guess is that stress relieving of the OVC over time has caused this – we are investigating. Survey report is available. We are looking into either over- drilling on  the existing bellow flange holes to match the surveyed hole positions on the OVC, or create a new set of holes at half pitch to the existing holes. In other words, the bellow flange will simply have holes to mate the two adjacent modules whatever their hole positions are. The Helium side is aligned to within 128 microns and -87 microns in the x and y coordinates respectively and the Hydrogen side is aligned to -113 and 67 microns. The required tolerance is ±250 microns.

  7. Recent Progress and Status Wiring showing the tails exiting the cold mass

  8. Odds and Ends Poorly performing Cryomech cooler has been returned from US – second one now has to be shipped back. Control and instrumentation is all now available and will be shipped to RAL soon. Power supplies have arrived and will also be shipped to RAL soon.

  9. HTS Lead thermal link Some off-line measurements are being made on the thermal link between the HTS leads and the cryocooler mid stage. This is a critical joint. Found that Cu/Stycast/0.2mm FR4/Stycast/Cu joint is not as good as sandwich with 50µm Kapton Kapton is ~ x2 better than the FR4 and can withstand 4kV

  10. R9 Facility Chiller for cryocoolers Area cleared and Yellow line for 5 Gauss limit.. Scaffolding CERN Field Measurement equipment

  11. Schedule

  12. END