1 / 9

C - Series Installation

C - Series Installation.

janae
Télécharger la présentation

C - Series Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C - Series Installation Installation of C-Series signs is quick, easy and can be accomplished by anyone with just a little mechanical aptitude. Before beginning the installation read through the installation manual, gather all of the necessary equipment, and run electrical conduit to the sign location, Make sure all necessary permits are in-hand!

  2. C - Series Installation A foundation kit will be sent to the church as soon as the order is received. This kit will contain detailed instructions, bolt layout template and all bolts, washers, and nuts needed for installation

  3. C - Series Installation • Dig your holes according to specifications in the instruction manual

  4. C - Series Installation Cut your bolt pattern and layout according to the template provided.

  5. C - Series Installation • Pour concrete in holes making sure the electrical conduit is centered between the bolts.

  6. C - Series Installation Your sign will arrive by common carrier. It will be mounted on a wooden pallet. The freight company will not unload unless you have made arrangements prior to receiving the sign. You will need 4 to 6 strong individuals to help off-load the sign.

  7. C - Series Installation After you have unloaded and uncrated your sign, mount the sign on the bolts, and secure it with the other bolts provided

  8. C - Series Installation After the sign has been secured to the foundation bolts, place grout under the feet as shown in the installation instructions.

  9. C - Series Installation Complete your installation by making the electrical connections. Enjoy your sign!

More Related