Module S11 – Project management

Module S11 – Project management. S11-B1 Planning of projects, Logical Framework Approach. Eurocrafts 21. PCM: In different phases of a project Management activities and Decision-making procedures. LFA: Programme - project planning, monitoring and evaluating methodology

joedean
Télécharger la présentation

Module S11 – Project management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module S11 – Project management S11-B1 Planning of projects, Logical Framework Approach Eurocrafts 21

  2. PCM: In different phases of a project Management activities and Decision-making procedures LFA: Programme - project planning, monitoring and evaluating methodology It provides a framework for thinking of goals, means and stakeholders PCM - LFA Decision making and project implementation in predetermined way Project management methodology and tool

  3. Logical Framework Approach Logical Framework Approch more than a matrix!

  4. Intervetion logic Objective Overall objectives Purpose Specific objectives Programmeobjectives Results Operative objectives Activities Inputs

  5. The logframe matrix

  6. Assumptions • Assumptions are external factors that have the potential to influence (or even determine) the success of a project, but lie outside the direct control of project managers. How assumptions affect objectives

  7. Assessment of Assumptions

  8. Example of assumptions

  9. Indicators • Objectively Verifiable Indicators describe the project’s objectives in operationally measurable terms (quantity, quality, time – or QQT). Specifying OVIs helps to check the feasibility of objectives and helps form the basis of the project’s monitoring and evaluation system.

  10. Indicators Objecives Indicator Source of verification • Good indicators – SMART criteria • Specific • Measurable • Achievable • Realistic • Time-based