MERIT installation: Update July 2006

MERIT installation: Update July 2006. A.Fabich CERN AB-ATB http://cern.ch/merit July 2006. Contents. The layout file EDMS versions obsolete CDD number PS_XXMER0001 Small location change of peripheral racks in TT2 Requested by Cryogenics Electrical supplies

jovita
Télécharger la présentation

MERIT installation: Update July 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MERIT installation: Update July 2006 A.Fabich CERN AB-ATB http://cern.ch/merit July 2006 A.Fabich

  2. Contents • The layout file • EDMS versions obsolete • CDD number PS_XXMER0001 • Small location change of peripheral racks in TT2 • Requested by Cryogenics • Electrical supplies • Summary of responses to the query of last week A.Fabich

  3. J. Metselaar, AT/ECR ACAD layout file • EDMS versions obsolete (cancelled) • New version available within EDMS/CDD • https://edms.cern.ch/cdd/plsql/c4w_02.drawing_info?num=PS_XXMER0001 • This is an active document. It is permanently updated. Recently incorporated/updated items: • Cryogenic installations: DVB, heater, lines • Passages TT2/TT2A • Distribution boxes: • Electrical power (220V/400V) • Ethernet • Several cuts/views Following soon: • Details of control/electronic racks in TT2, horizontal platforms • Beam line elements • Beam monitors • Quadrupoles • Transport study is on-going: false floor, ramp ... A.Fabich

  4. Changed position of racks NEW proposal Power distribution box ETHERNET OLD layout ~1.4 m Is this acceptable? A.Fabich

  5. Electrical power supply (220/400 V) • Received response from the groups responsible for mercury loop, optical diagnostics, cryogenics, particle detectors and beam diagnostics. • Sufficient input for releasing installation request. • The power outlets will be installed in TT2 next to the racks (see ACAD drawing). • Installation scheduled for October 2006 “Open” issues: • Optical diagnostics asked for 110 Volt • Is this really required? • Can it be provided by the Hg loop system, which has already internally 110V supplies? • Hg loop • Power cable (not conform with IS23) can be adapted in place at CERN. • US plugs can be exchanged/adapted in place at CERN. A.Fabich