1 / 5

MOD 258A Demand Estimation Sample Point – Shipper Report.

MOD 258A Demand Estimation Sample Point – Shipper Report. Joel Martin 14 th January 2010. Background to the Report. MODs 258 & 258A highlighted the protections offered to NDM Sample points in UNC H1.6.

Télécharger la présentation

MOD 258A Demand Estimation Sample Point – Shipper Report.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MOD 258A Demand Estimation Sample Point – Shipper Report. Joel Martin 14th January 2010

  2. Background to the Report • MODs 258 & 258A highlighted the protections offered to NDM Sample points in UNC H1.6. • MOD consultation process highlighted the requirement for a report to allow Shippers to identify their Supply Points within the NDM sample. • Transporters agreed as part of post MOD implementation to provide a monthly report to Shippers.

  3. Current Position. • MOD 258A implemented on 01/01/10. • Transporters instigated a change request with xoserve to provide Shipper report. • xoserve have delivered draft report for comment.

  4. The Shipper NDM Sample Report. • Will be provided to each Shipper by e-mail from 01/04/10 detailing NDM Demand Estimation Sample Points within their portfolio. • The accuracy of the report is dependent on the accuracy of the data in Sites & Meters Dbase. • Report should be utilised for purposes of ensuring the continued integrity of the NDM demand sample only. • NDM Demand Sample is continually changing and the report only offers a monthly snapshot of data.

  5. Next steps…. • Shippers to provide xoserve with e-mail address for the delivery of the monthly report to: xoserve.demand.estimation@xoserve.com • Shippers with multiple to Shipper shortcodes to provide a single e-mail address for all reports. • Where e-mail address are not received for the report existing billing / SPA account e-mail addresses will be used. • Please respond to xoserve by 26/02/10. • Transporters & xoserve would welcome any comments / suggestions on the report to: xoserve.demand.estimation@xoserve.com

More Related