An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting 6-05-03

  2. EDM EXPERIMENT ASSEMBLY DR Gas Cart & Control Rack DR 3He Pump System & DR 1K Pot Pump System Purifier 1ºK Pot Pump System Steel/Poly Shielding 3He Polarized Source 3He Polarized Source Backing Pump & Gas System Support Framework Beam Guide & Polarizer Perm-alloy Magnetic Shielding (5 Layers) T0 Chopper EDM Cryostat Cold Head Compressors 1000 Liter Dewar Bismuth Filter

  3. EDM in ER2 Requirements • Floor Space Issues • Access for Maintenance operations • Staging area w/ crane coverage for assembly activities • Access to Upper Cryostat • Initial Installation of large components – mobile crane to move items over flight-path 13 • “Counting House” floor space • Vibration Isolation Pad • Crane Path Access across FP12 and FP13

  4. EDM in ER2 Requirements (2) • Service Issues • AC Power – 250KVA (see list) • Possible 4He Liquefier/Compressor shed • Safety Issues • Emergency Helium Vent (exit out east wall) • Radiation Safety – especially on top of apparatus • Crane Trip (highest point of current design 17’) • NPDGamma Issues • EDM T0 Chopper located in Beam Stop • Bismuth Filter inside NPDGamma cave

  5. EDM IN ER2 ELEVATION

  6. EDM Experiment Power Requirements • DRS 3000 Dilution Refrigerator 32KW • 4He Purifier Pump 23KW • 3He Polarized Source 23KW • EDM Cryostat 33KW • Miscellaneous 39KW • Optional Liquefier 50KW • Spare Capacity 50KW Total 250KW

  7. EDM Experiment Power Requirements (2) • DRS 3000 Dilution Refrigerator • 3He Circulation/1°K Pot Pump System 4000 M3/hr Roots Pump 15KW 1000 M3/hr Roots Pump (2) 6KW 70 M3/hr Dry Backing Pump (2) 5KW • 3He Gas System & Controls 6KW • 4He Purifier Pump System 4000 M3/hr Roots Pump 15KW 1000 M3/hr Roots Pump 3KW 70 M3/hr Dry Backing Pump (2) 5KW

  8. EDM Experiment Power Requirements (3) • 3He Polarized Source RDK415D 4°KCold Head 9KW Varian V2000 Turbo Pump 2KW Varian V1000 Turbo Pump (2) 3KW Edwards XDS10 Scroll Pump (3) 3KW Pfeiffer Unidry 050 Pump 4KW Gas Cart & Instrumentation 2KW • EDM Cryostat RDK415D 4°KCold Head (3) 27KW Vacuum Pumps 6KW

  9. EDM Experiment Power Requirements (4) • Miscellaneous Leak Detector 2KW HV Power Supply 2KW Bismuth Neutron Filter Cold Head 15KW EDM General Controls & Data Acquisition 10KW T0 Chopper 10KW