An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Market Interface Committee Renewable Integration Issues

  2. Introductions • Versify • Focused on software applications and tools in two areas of the power industry • Core competency in highly scalable data collection, processing, analytics, and reporting systems • Partnership with CECD • Constellation Energy Control & Dispatch (CECD) • A decade of experience Successfully implemented 30 Control Areas/Balancing Authorities in 5 NERC Regions • Currently operates 11 Balancing Authorities (including GWA) with NERC and regionally certified personnel • International Demand Response center for implementation, dispatch, ISO interface, and reporting

  3. Agenda • Wind Integration Challenges • CECD Solution provider • Example: Glacier Wind • AGC and Reserve Requirements • Compliance Management and reporting • Market Tools & Techniques • Closing

  4. Wind Integration Issues • Wind variability  Volatility • Wind Facility Complexity • Forecasting accuracy • Long Term • Short Term • Intra-hour balancing

  5. CECD Solution CECD Solution

  6. Integration Desk (I-Desk) • Increased focus and granularity to manage volatility • Integration of wind with multiple sources of AGC • Implement dynamic ties in new, compliant ways • Utilization of software and systems that are “fine tuned” for unique requirements

  7. CECD Toolset Dedicated Integration Desk (“I-Desk”) • Trained Staff • EMS • Near Term Forecasting Tools • Data management processing/reporting (Versify)

  8. Glacier Wind Glacier Wind

  9. Glacier Wind Glacier Wind Project (GWA) • Located in Cut Bank, Montana • 106.5 MW Capacity (71 turbines) • GWA began operating as BA on Oct 15, 2008. • First wind-only Balancing Authority.

  10. Operational Requirements • AGC Contracts from 3rd party sources • Operating Agreements with Adjacent BA describing normal and emergency operations • Contingency Reserve Requirements in place

  11. AGC & Reserve Requirements • BA Responsibility to maintain AGC capacity for: • Frequency Bias response, CPS, 5% Operating Reserve margin • Additional AGC to balance wind variability • Wind profile case study • Deviation from forecast used to define additional AGC requirement

  12. Tools & Techniques • Executed Regulating Reserve Services Agreement w/ third party. • AGC and Dynamic Schedule • Provides significant ability to balance energy at any time • GWA will participate in ACE Diversity Interchange (ADI) to share ACE signals with BA’s and balance with each other. • Allows for adjustment through ACE sharing with other participants • Wind forecasting tools • Worked closely with adjacent BA Northwestern Energy • NWPP reserve pool membership for contingency reserves

  13. Closing • Focus on granularity to manage reliability • Responsibility as a BA is to make sure energy flows • Potentially scalable solution as gain knowledge and experience Dave Ippolito, Versify dippolito@iversify.com JT Thompson, CECD jt.thompson@constellation.com