CanSat 2013 PDR Outline Version 0.2. Your Team # Here Your Team Name Here. Presentation Outline. Provide a simple outline of the presentation If possible, indicate the team member(s) who will be presenting each section Terms:
E N D
CanSat 2013 PDR Outline Version 0.2 Your Team # Here Your Team Name Here CanSat 2013 PDR: Team ### (Team Name)
Presentation Outline • Provide a simple outline of the presentation • If possible, indicate the team member(s) who will be presenting each section • Terms: • Container refers to the Re-entry Container component of the CanSat • Payload refers to the Science Payload component of the CanSat IMPORTANT PRESENTATION GUIDELINE FOR CANSAT 2013: Teams should focus on charts with this star icon during the presentation. Other charts should be skipped to save time; they will be reviewed by the judges off line. Presentations are to be 30 minutes in length. Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Team Organization • Single slide listing the team members and their roles • If possible, please include year (freshman, sophomore, etc.) for reference • This only needs to be provided once for team members showing up multiple times on the org chart • Good format is the use of an organization chart, such as below: Sample Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Acronyms • Provide a list of acronyms used throughout the presentation • During presentations, do not read through these acronyms • These are for reference only Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
The purpose of this section is to introduce the reviewer to the overall requirements and configuration of the CanSat. This provides a basis for the details presented in the subsystem sections. Systems Overview Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)
Mission Summary • Overview of the mission objectives • Indicate which one (1) selectable objective is being attempted • Describe selection rationale • Include any external objectives (personal, laboratory or sponsor, class, etc.) relevant to the design Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
System Requirement Summary • Overview of system (mission) level requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate the team understands the system-level requirements Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
System Level CanSat Configuration Trade & Selection • Present preliminary system-level concepts considered • What configurations were considered • Present criteria for final configuration selection • Include discussion of why the final configuration was selected • Include sketches and diagrams of various concepts considered • Diagrams of non-selected configurations can include sketches of physical layouts (e.g. scans of hand sketches rather than CAD drawings) • Include variations on CONOPS considered • Limit discussions to 1-2 slides per preliminary configuration • Presentation of the material may be at a cursory level (hit the highlights) Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
System Concept of Operations • 1-3 slides providing overview of CanSat operations • Include: • Launch and descent operations • Post-launch recovery and data reduction • Focus on selected configuration CONOPS • Focus on how the CanSat will operate, not what everyone on the team will be doing (to be discussed at CDR) • Simple flow diagrams and cartoons are a good way to present the CONOPS Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Physical Layout • Diagram(s) showing physical layout of selected CanSat configuration • Make sure to include: • Dimensions • Placement of major components • Relevant configurations • Container, Payload, launch configuration, deployed, etc. • The goal is to present the physical idea of what the CanSat will look like for reference prior to getting into details of the design Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Launch Vehicle Compatibility • Discussion of how the CanSats are integrated into the rocket payload section • Discussion of how the rocket payload section compatibility will be verified prior to launch day • Include a dimensioned drawing that shows clearances with the payload section • Focus on launch configuration (Container + Payload) • Include all descent control apparatus • At PDR this may be allocated dimensions (if this is the case, these should be requirements at the system and subsystem levels) • Note: • In past years there were a large number of CanSats that did not deploy from the payload sections of the rocket because of protrusions Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Sensor Subsystem Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)
Sensor Subsystem Overview • One slide providing an overview of the CanSat sensor system • Include summary of the selected sensors (type & models) • Include brief discussion of what the sensors are used for • Focus on selected component (not all components trades) • Include overview of both Container and Payload sensors, as applicable Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Sensor Subsystem Requirements • Overview of sensor subsystem requirements • Use bullets or a table to demonstrate an understanding of the requirements for this subsystem • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges an understanding of the requirements that apply to the subsystem • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsysytem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
GPS Trade & Selection • Summary of GPS sensor trade studies and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Non-GPS Altitude Sensor Trade & Selection • Summary of altitude sensor trade study and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Air Temperature Trade & Selection • Summary of air temperature sensor trade study and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Video Camera Trade & Selection • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Impact Force Sensor Trade & Selection • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Descent Control Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)
Descent Control Overview • ONE slide providing an overview of the Container and Payload descent control system(s) • Include overview of the selected configurations and components necessary • Include diagrams outlining descent control strategy for various flight altitude ranges Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Descent Control Requirements • Overview of subsystem requirements • Use bullets or a table to demonstrate an understanding of the DCS requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the system-level requirements • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsystem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Container Descent Control Strategy Selection and Trade • Summary of container DCS strategy trade studies and selection • Include: • Color selection • Shock force survival • DCS connections • Preflight review testability See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Payload Descent Control Strategy Selection and Trade • Summary of Science Payload DCS strategy trade studies and selection • Include color selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Descent Rate Estimates • Present estimates for the following CanSat configurations • Container + Payload post separation (prior to deployment of the Payload) • Container following deployment of the Payload • Payload following separation from the Container • Include discussion of • Calculations used • Assumptions • This discussion can carry over to multiple slides if necessary Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Mechanical Subsystem Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)
Mechanical Subsystem Overview • One slide providing overview of the mechanical subsystem • Include overview of major structural elements, material selection, and interface definitions • Include Container and Payload mechanical configurations Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Mechanical Sub-System Requirements • Overview of mechanical sub-system requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the requirements that apply to this sub-system • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsytem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Egg Protection Trade & Selection • Egg protection system trade studies and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Mechanical Layout of Components Trade & Selection • Key trade issues related to mechanical layout and component selection • Structural material selection(s) See slide discussing trade studies CanSat 2013 PDR: Team ### (Team Name)
Material Selections • Discussion of what materials will be used for the mechanical components and why CanSat 2013 PDR: Team ### (Team Name)
Container - Payload Interface • Describe how the Payload will be connected to and released (mechanically) from the Container • Include: • Discussion of how descent control apparatus will be accommodated • Diagrams • Method of operation Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Structure Survivability Trades • For both Container and Payload discuss: • Electronic component mounting methods • Electronic component enclosures • Acceleration and shock force requirements and testing • Securing electrical connections (glue, tape, etc.) • Consider required judge verification during pre-flight check in See slide discussing trade studies CanSat 2013 PDR: Team ### (Team Name)
Mass Budget • Table(s) providing the following: • Mass of all components • Mass of all structural elements • Sources/uncertainties – whether the masses are estimates, from data sheets, measured values, etc. • Total mass • Margin • Must clearly distinguish between Container and Payload masses • Include allocated mass for egg payload Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Communication and Data Handling (CDH) Subsystem Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)
CDH Overview • One slide providing overview of the CDH subsystem • Should include selected components (with brief mention of what each component is for) Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
CDH Requirements • Overview of CDH sub-system requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the requirements that apply to this sub-system • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsystem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Processor & Memory Trade & Selection • Include processor speed • Include data interfaces (types and numbers) • Include memory storage requirements, if applicable See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Antenna Trade & Selection • Antenna selection criteria • Antenna range and patterns See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Radio Configuration • Demonstrate an understanding of the protocol and configuration (e.g., mode and NETID) required to initialize and utilize the XBEE radio module • Provide description of the impact those requirements have on the CanSat design • Include transmission control • How is this managed during each mission phase? • Note: • Communications failures have occurred often over the past several years of the competition • You are encouraged to use your radios in all of your development and testing to better ensure mission success • Ideally you have started working with the radio and communications protocol Start Radio Prototyping and Testing Early! Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Telemetry Format • What data is included? • Data rate of packet? • How is data formatted? • Include example frames with complete descriptions Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Activation of Telemetry Transmissions • Discuss how telemetry transmissions are enabled via remote command on the launch pad Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Audible Locating Device Trade & Selection • Describe the audible locating device • How will audible locator devices be activated and deactivated? • (e.g. how and when the locators are activated and how they will be deactivated upon recovery) See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Electrical Power Subsystem (EPS) Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)
EPS Overview • One slide providing overview of EPS components (with purposes) • Consider using a diagram Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
EPS Requirements • Overview of EPS subsystem requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the requirements that apply to this sub-system • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsystem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Electrical Block Diagram • High-level schematic (not down to the resistor level) showing power connections • Include required voltages • Include all major components • Include overview of how power will be controlled and verified externally without disassembling the CanSat • I.e., an easily accessible external switch Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Power Budget • Power budget in tabular format which includes: • Power consumption (W) of all components • Expected duty cycles for all components • Source/uncertainty for each line item • Estimate, data sheet, measurement, etc. • Total power consumed (mAh) • Power available/ battery capacity (mAh) • Margins • Include potential one hour wait on the launch pad Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Power Source Trade & Selection • Discussion of power source selection • Do not consider or select lithium polymer (LiPo) batteries, which are not allowed because of fire risk See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)
Battery Voltage MeasurementTrade & Selection • Discuss voltage measurements technique / circuit See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)