An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CanSat 2013 PDR Outline Version 0.2 Your Team # Here Your Team Name Here CanSat 2013 PDR: Team ### (Team Name)

  2. Presentation Outline • Provide a simple outline of the presentation • If possible, indicate the team member(s) who will be presenting each section • Terms: • Container refers to the Re-entry Container component of the CanSat • Payload refers to the Science Payload component of the CanSat IMPORTANT PRESENTATION GUIDELINE FOR CANSAT 2013: Teams should focus on charts with this star icon during the presentation. Other charts should be skipped to save time; they will be reviewed by the judges off line. Presentations are to be 30 minutes in length. Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  3. Team Organization • Single slide listing the team members and their roles • If possible, please include year (freshman, sophomore, etc.) for reference • This only needs to be provided once for team members showing up multiple times on the org chart • Good format is the use of an organization chart, such as below: Sample Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  4. Acronyms • Provide a list of acronyms used throughout the presentation • During presentations, do not read through these acronyms • These are for reference only Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  5. The purpose of this section is to introduce the reviewer to the overall requirements and configuration of the CanSat. This provides a basis for the details presented in the subsystem sections. Systems Overview Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)

  6. Mission Summary • Overview of the mission objectives • Indicate which one (1) selectable objective is being attempted • Describe selection rationale • Include any external objectives (personal, laboratory or sponsor, class, etc.) relevant to the design Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  7. System Requirement Summary • Overview of system (mission) level requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate the team understands the system-level requirements Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  8. System Level CanSat Configuration Trade & Selection • Present preliminary system-level concepts considered • What configurations were considered • Present criteria for final configuration selection • Include discussion of why the final configuration was selected • Include sketches and diagrams of various concepts considered • Diagrams of non-selected configurations can include sketches of physical layouts (e.g. scans of hand sketches rather than CAD drawings) • Include variations on CONOPS considered • Limit discussions to 1-2 slides per preliminary configuration • Presentation of the material may be at a cursory level (hit the highlights) Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  9. System Concept of Operations • 1-3 slides providing overview of CanSat operations • Include: • Launch and descent operations • Post-launch recovery and data reduction • Focus on selected configuration CONOPS • Focus on how the CanSat will operate, not what everyone on the team will be doing (to be discussed at CDR) • Simple flow diagrams and cartoons are a good way to present the CONOPS Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  10. Physical Layout • Diagram(s) showing physical layout of selected CanSat configuration • Make sure to include: • Dimensions • Placement of major components • Relevant configurations • Container, Payload, launch configuration, deployed, etc. • The goal is to present the physical idea of what the CanSat will look like for reference prior to getting into details of the design Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  11. Launch Vehicle Compatibility • Discussion of how the CanSats are integrated into the rocket payload section • Discussion of how the rocket payload section compatibility will be verified prior to launch day • Include a dimensioned drawing that shows clearances with the payload section • Focus on launch configuration (Container + Payload) • Include all descent control apparatus • At PDR this may be allocated dimensions (if this is the case, these should be requirements at the system and subsystem levels) • Note: • In past years there were a large number of CanSats that did not deploy from the payload sections of the rocket because of protrusions Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  12. Sensor Subsystem Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)

  13. Sensor Subsystem Overview • One slide providing an overview of the CanSat sensor system • Include summary of the selected sensors (type & models) • Include brief discussion of what the sensors are used for • Focus on selected component (not all components trades) • Include overview of both Container and Payload sensors, as applicable Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  14. Sensor Subsystem Requirements • Overview of sensor subsystem requirements • Use bullets or a table to demonstrate an understanding of the requirements for this subsystem • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges an understanding of the requirements that apply to the subsystem • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsysytem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  15. GPS Trade & Selection • Summary of GPS sensor trade studies and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  16. Non-GPS Altitude Sensor Trade & Selection • Summary of altitude sensor trade study and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  17. Air Temperature Trade & Selection • Summary of air temperature sensor trade study and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  18. Video Camera Trade & Selection • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  19. Impact Force Sensor Trade & Selection • SELECTABLE OBJECTIVE – ONLY REQUIRED IF SELECTED See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  20. Descent Control Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)

  21. Descent Control Overview • ONE slide providing an overview of the Container and Payload descent control system(s) • Include overview of the selected configurations and components necessary • Include diagrams outlining descent control strategy for various flight altitude ranges Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  22. Descent Control Requirements • Overview of subsystem requirements • Use bullets or a table to demonstrate an understanding of the DCS requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the system-level requirements • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsystem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  23. Container Descent Control Strategy Selection and Trade • Summary of container DCS strategy trade studies and selection • Include: • Color selection • Shock force survival • DCS connections • Preflight review testability See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  24. Payload Descent Control Strategy Selection and Trade • Summary of Science Payload DCS strategy trade studies and selection • Include color selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  25. Descent Rate Estimates • Present estimates for the following CanSat configurations • Container + Payload post separation (prior to deployment of the Payload) • Container following deployment of the Payload • Payload following separation from the Container • Include discussion of • Calculations used • Assumptions • This discussion can carry over to multiple slides if necessary Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  26. Mechanical Subsystem Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)

  27. Mechanical Subsystem Overview • One slide providing overview of the mechanical subsystem • Include overview of major structural elements, material selection, and interface definitions • Include Container and Payload mechanical configurations Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  28. Mechanical Sub-System Requirements • Overview of mechanical sub-system requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the requirements that apply to this sub-system • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsytem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  29. Egg Protection Trade & Selection • Egg protection system trade studies and selection See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  30. Mechanical Layout of Components Trade & Selection • Key trade issues related to mechanical layout and component selection • Structural material selection(s) See slide discussing trade studies CanSat 2013 PDR: Team ### (Team Name)

  31. Material Selections • Discussion of what materials will be used for the mechanical components and why CanSat 2013 PDR: Team ### (Team Name)

  32. Container - Payload Interface • Describe how the Payload will be connected to and released (mechanically) from the Container • Include: • Discussion of how descent control apparatus will be accommodated • Diagrams • Method of operation Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  33. Structure Survivability Trades • For both Container and Payload discuss: • Electronic component mounting methods • Electronic component enclosures • Acceleration and shock force requirements and testing • Securing electrical connections (glue, tape, etc.) • Consider required judge verification during pre-flight check in See slide discussing trade studies CanSat 2013 PDR: Team ### (Team Name)

  34. Mass Budget • Table(s) providing the following: • Mass of all components • Mass of all structural elements • Sources/uncertainties – whether the masses are estimates, from data sheets, measured values, etc. • Total mass • Margin • Must clearly distinguish between Container and Payload masses • Include allocated mass for egg payload Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  35. Communication and Data Handling (CDH) Subsystem Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)

  36. CDH Overview • One slide providing overview of the CDH subsystem • Should include selected components (with brief mention of what each component is for) Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  37. CDH Requirements • Overview of CDH sub-system requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the requirements that apply to this sub-system • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsystem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  38. Processor & Memory Trade & Selection • Include processor speed • Include data interfaces (types and numbers) • Include memory storage requirements, if applicable See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  39. Antenna Trade & Selection • Antenna selection criteria • Antenna range and patterns See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  40. Radio Configuration • Demonstrate an understanding of the protocol and configuration (e.g., mode and NETID) required to initialize and utilize the XBEE radio module • Provide description of the impact those requirements have on the CanSat design • Include transmission control • How is this managed during each mission phase? • Note: • Communications failures have occurred often over the past several years of the competition • You are encouraged to use your radios in all of your development and testing to better ensure mission success • Ideally you have started working with the radio and communications protocol Start Radio Prototyping and Testing Early! Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  41. Telemetry Format • What data is included? • Data rate of packet? • How is data formatted? • Include example frames with complete descriptions Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  42. Activation of Telemetry Transmissions • Discuss how telemetry transmissions are enabled via remote command on the launch pad Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  43. Audible Locating Device Trade & Selection • Describe the audible locating device • How will audible locator devices be activated and deactivated? • (e.g. how and when the locators are activated and how they will be deactivated upon recovery) See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  44. Electrical Power Subsystem (EPS) Design Presenter Name(s) Go Here CanSat 2013 PDR: Team ### (Team Name)

  45. EPS Overview • One slide providing overview of EPS components (with purposes) • Consider using a diagram Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  46. EPS Requirements • Overview of EPS subsystem requirements • Use bullets or a table to demonstrate an understanding of the mission requirements • This chart may be expanded to multiple charts as needed • The purpose of the chart is to demonstrate to the judges that the team understands the requirements that apply to this sub-system • Clearly indicate: • Which Competition Guide Requirements are allocated to this subsystem • Any derived requirements for the subsystem Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  47. Electrical Block Diagram • High-level schematic (not down to the resistor level) showing power connections • Include required voltages • Include all major components • Include overview of how power will be controlled and verified externally without disassembling the CanSat • I.e., an easily accessible external switch Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  48. Power Budget • Power budget in tabular format which includes: • Power consumption (W) of all components • Expected duty cycles for all components • Source/uncertainty for each line item • Estimate, data sheet, measurement, etc. • Total power consumed (mAh) • Power available/ battery capacity (mAh) • Margins • Include potential one hour wait on the launch pad Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  49. Power Source Trade & Selection • Discussion of power source selection • Do not consider or select lithium polymer (LiPo) batteries, which are not allowed because of fire risk See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)

  50. Battery Voltage MeasurementTrade & Selection • Discuss voltage measurements technique / circuit See slide discussing trade studies Presenter: Name goes here CanSat 2013 PDR: Team ### (Team Name)