The Orthotic Manufacturing Process. Hand-plaster poured and manufactured the old-fashioned way. Foam Impression or Plaster cast in sub-talar neutral position is received by the Lab. Step 1 – Quality-control process initiated. Order is entered into system and measurements are cross-checked.

The Orthotic Manufacturing Process - slide 1
01 / 20The Orthotic Manufacturing Process
1 / 17

Télécharger la présentation

The Orthotic Manufacturing Process
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. The Orthotic Manufacturing Process

  2. Hand-plaster poured and manufactured the old-fashioned way.

  3. Foam Impression or Plaster cast in sub-talar neutral position is received by the Lab

  4. Step 1 – Quality-control process initiated. Order is entered into system and measurements are cross-checked.

  5. Step 2 – Process of pouring liquid plaster into plaster and foam negatives to make a positive.

  6. Step 3 – Negative cast markings are transferred onto positive mould before being discarded.

  7. Step 4 – Rear Foot and Fore Foot corrected to Lab specifications unless mentioned on the Rx Form.

  8. Step 5 – A second quality-control check is performed.

  9. Step 6 – The selected shell material is then carefully heated to specific standards

  10. Step 7 – Plaster corrected positive is ready for moulding of the shell in the Vacuum former

  11. Step 8 – Plastic is then placed over the positive cast

  12. Step 9 – High-pressure vacuum is then applied over plastic sitting on top of mould.

  13. Step 10 – Formed shell is now ready to be ground into shape

  14. Step 11 – Shell is shaped using various drum grinders and buffers.

  15. Step 12 – A third quality-control check is performed.

  16. Step 13 – Shell evaluation to corrected positive.

  17. Step 14 – Desired top covers and underlay added as per Rx form.

  18. Step 15 – Orthotic is then shaped to desired foot-bed, cleaned and polished

  19. Step 16 – Completed orthotic goes through a 4th and final Quality control check

  20. Orthotic is shipped via UPS from Lab to Clinic. Total Turnaround time – 5 to 7 business days