leland
Uploaded by
15 SLIDES
259 VUES
150LIKES

Analysis of Input Queuing in Complex Systems: A Simulation Study

DESCRIPTION

Explore the complexities of input queueing in network systems through simulation and theoretical analysis. Investigate throughput, arrival rates, and queue lengths for various contention-resolution policies. Discover the impact of queue setup on system performance.

1 / 15

Télécharger la présentation

Analysis of Input Queuing in Complex Systems: A Simulation Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Analysis of Input Queueing • More complex system to analyze than output queueing case. • In order to analyze it, we make a simplifying assumption of "heavy load", i.e. all queues are always full. • This is a worst-case assumption.

  2. head-of-line (HOL) blocking Winning packet Input Queues Outputs Losing packet 3 1 1 2 1 Internally Nonblocking Switch 2 cannot access output 2 because it is blocked by the first packet 4 3 3 4

  3. Internally Nonblocking Switch:Dropping packets 0= Pr[ carry a packet ] 1 2 3 2 Pr[ carry a packet ] =p for large N For p=1, 0= 0.632

  4. the fictitious output queues used for analysis Output 1 Fictitious Output Queues formed by HOL packets (3,2) (1,2) Output 2 (2,3) Output 3 (4,4) Output 4 (input, output) Outputs (1,1) (1,2) 1 (2,1) (2,3) Internally Nonblocking Switch 2 (3,2) (3,2) 3 (4,1) (4,4) 4

  5. N 2 3 4 5 * 0.75 0.68 0.66 0.64 • How about small N? * : the maximum throughput with input queueing • Simulation Results with Large N

  6. Throughout of Input-Buffered Switch • Consider a fictitious queue i = # packets at start of time slot m. = # packets arriving at start of time slot m. • is Poisson and independent of as N 

  7. e.g. Fictitious Queue i 1 i i 1 i i 1 2 2 2 3 i time slot m time slot m-1

  8. – under saturation –

  9. Input Queue For finite buffer size, if p0 > p* = 0.586 at least (p0 - p*)/ p0 fraction of packets are dropped. Must keep p0 < p* Meaning of Saturation Throughput p0 =   p = throughput

  10. Queuing scenario for the delay analysis of the input-buffered switch Fictitious Queues Output 1 Input Queue 1/N 1/N N 2 Output 2 HOL 1/N Time spent in HOL are independent for successive packets when N is large Output N Service times at different fictitious queues are independent

  11. The busy periods and interpretations for delay analysis of an input queue U(t) X3  X0   X1  X2 X0 t Idle period Y Busy period Busy period Arrivals here are considered as arrivals in intervals i-2 Arrivals here are considered as arrivals in intervals i-1 Xi-1 Xi

  12. Illustration of the meanings of random variables used in the delay analysis of an input queue mi =2 prior arrivals Arrival of the packet of focus. One simultaneous arrival to be served before the packet; L=1. Departure of packet of focus. (1) (1) (2) Xi Xi+1 Ri W -- Packet arrival in interval i. -- packet departure in interval i+1. (n) -- number of arrivals

  13. Three Selection Policies • Random Selection Policy • If k packets are addressed to a particular output, one of the k packets is chosen at random, each selected with equal probability 1/k. • Longest Queue Selection Policy • The controller sends the packet from the longest queue • Fixed Priority Selection Policy • The N inputs have fixed priority levels and of the k packets, the controller send the one with highest priority

  14. Different contention-resolution policies have different waiting time versus load relationships, but a common maximum load at which waiting time goes to infinity. _ W p0

  15. Conclusion • Mean queue length are always greater for queueing on inputs than on outputs • Output queues saturate only as the utilization approaches unity • Input queues saturate at a utilization that depends on N, but is approximately 0.586 when N is large

More Related