1 / 7

Magnetic Manipulator

Magnetic Manipulator. Team 125 Marley Rutkowski John Olennikov Benjamin Younce Chad Perkins Faculty Advisor: Dr.  Robert Albright Industrial Advisor: Andy McConnell Client: Dr. Mark Utlaut. Our Project. GOAL: Achieve controlled levitation in 1D (or 2D) space

lewis-glass
Télécharger la présentation

Magnetic Manipulator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Magnetic Manipulator • Team 125 • Marley Rutkowski John Olennikov Benjamin Younce Chad Perkins • Faculty Advisor: Dr.  Robert Albright • Industrial Advisor: Andy McConnell • Client: Dr. Mark Utlaut

  2. Our Project • GOAL: • Achieve controlled levitation in 1D (or 2D) space • HOW: • Monitor Lev position • Switch Electromagnets on/off if below/above desired position

  3. System Block Diagram

  4. Design Challenges • Design and implement hardware and software to drive electromagnets and sense levitating object position • Experiment with system and optimize hardware and Arduino code for stable controlled levitation

  5. Risks • Controlled levitation in 2D is more difficult to achieve than expected • Testing and optimization is difficult / takes too long • A part breaks or malfunctions

  6. Primary Milestones • Fri 15 Nov - Complete Design Document Complete Final Budget • Fri 6 Dec - Finalize prototype plans. All parts purchased or ordered • Fri 24 Jan - Begin prototype build • Fri 7 Feb - Prototype build 100% complete. Begin testing/debugging of prototype • Fri 21 Feb - Have at least 1 dimensional movement working • Fri 04 Apr - Present Final Program Review with Demonstration. Complete Final Report • Tue 08 Apr - Present Founder’s Day (Project Presentation)

  7. Questions? ;-)