Vegetation Removal and Restoration Guidelines for Billboard Clearing in North Carolina

These guidelines outline the selective vegetation removal process for old billboard clearing in North Carolina, including compensation areas, tree measurements, cutting zones, and restoration requirements. Site reviews determine tree sizes, cutting zones, and compensation costs.

lilike
Télécharger la présentation

Vegetation Removal and Restoration Guidelines for Billboard Clearing in North Carolina

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Carolina's Selective Vegetation Removal

  2. OldClearing Limits Billboard Centerline 125’ ROW Trees Mowing Line 40’ Travel Lane

  3. Existing Clearing Limits Billboard 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’

  4. Site Review Blocked Sign Face Sign Face Not Blocked

  5. Site Review Determine if trees were 4 inches in diameter at time sign was installed

  6. Site Review Layout Cutting Zone

  7. Compensation CompensationArea Billboard 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’

  8. Compensation III Measure Trees to determine ... If Trees are 12” in diameter at 6” above ground level, then measurement taken at 4’6” If Trees are less than 12” Diameter at 6” above ground level, measurement is taken at 6” … total caliper inch removal (for trees 4 inches and greater) and total cost.

  9. Restoration Plantings Desired Restoration Areas Billboard CompensationArea 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’

  10. Restoration Areas Billboard 125’ Centerline A 100’ B ROW II Trees I Mowing Line 40’ C D Travel Lane 50’ 250’

  11. Cutting Procedure Allowable Cutting Zones Billboard 125’ Centerline A 100’ B ROW II Trees I III Mowing Line 40’ C D E Travel Lane 50’ 250’