Installation of IBL Mock-Up for Center Tower in Building 180

This document details the installation of the IBL mock-up on March 18, 2011, by Marco Ciapetti. The layout includes critical elements such as heavy load rails, adjustable feet, and shims to ensure stability. The mock-up features mini-vans and various scaffolding solutions for operational efficiency. Key structural components like folding bridges, tower handrails, and table rails have been integrated to enhance functionality. The installation also addresses the need for floor covers to bridge gaps, ensuring safety and accessibility.

lori
Télécharger la présentation

Installation of IBL Mock-Up for Center Tower in Building 180

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

More Related