330 likes | 456 Vues
This document details the installation of the IBL mock-up on March 18, 2011, by Marco Ciapetti. The layout includes critical elements such as heavy load rails, adjustable feet, and shims to ensure stability. The mock-up features mini-vans and various scaffolding solutions for operational efficiency. Key structural components like folding bridges, tower handrails, and table rails have been integrated to enhance functionality. The installation also addresses the need for floor covers to bridge gaps, ensuring safety and accessibility.
E N D