1 / 8

Review of Sequencing System Installation for PS-SPS 2006 Startup

This document outlines the purpose, scope, and deliverables of the installation of the sequencing system in the CCR for the PSB/CPS/ADE/LEI/SPS/LHC accelerators as part of the PS-SPS 2006 startup review. It emphasizes the shift from MNR to CCR, the new CBCM design utilizing reflective memory, and the integration of LEIR with other accelerators. Additionally, it highlights the objectives of reducing signal transport between Meyrin and Prevessin and the continued operation of MTG for CTF3 in MNR.

matia
Télécharger la présentation

Review of Sequencing System Installation for PS-SPS 2006 Startup

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sequencing systemCCR & MNR layout Purpose, Scope and deliverables Jean-Claude BAU AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  2. PURPOSE • Installation in CCR of sequencing system for PSB/CPS/ADE/LEI/SPS/LHC accelerators • Not just a move from MNR to CCR • New CBCM design (Soft/Hard): • Using reflective memory • Merging LEIR with PSB/CPS/ADE/SPS accelerators • Integrating the two LEIR operating mode (coupled/decoupled) into the same FEC. • Less signals to transport between Meyrin and Prevessin • MTG for CTF3 will stay in MNR (Meyrin) AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  3. Layout overview AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  4. External conditions & events AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  5. CCR Racks AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  6. MNR Racks AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  7. Exchange signals AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

  8. CBCM : DELIVERABLES AB/CO/HT - Review of Activities for PS-SPS 2006 Startup

More Related