80 likes | 211 Vues
This document outlines the purpose, scope, and deliverables of the installation of the sequencing system in the CCR for the PSB/CPS/ADE/LEI/SPS/LHC accelerators as part of the PS-SPS 2006 startup review. It emphasizes the shift from MNR to CCR, the new CBCM design utilizing reflective memory, and the integration of LEIR with other accelerators. Additionally, it highlights the objectives of reducing signal transport between Meyrin and Prevessin and the continued operation of MTG for CTF3 in MNR.
E N D
Sequencing systemCCR & MNR layout Purpose, Scope and deliverables Jean-Claude BAU AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
PURPOSE • Installation in CCR of sequencing system for PSB/CPS/ADE/LEI/SPS/LHC accelerators • Not just a move from MNR to CCR • New CBCM design (Soft/Hard): • Using reflective memory • Merging LEIR with PSB/CPS/ADE/SPS accelerators • Integrating the two LEIR operating mode (coupled/decoupled) into the same FEC. • Less signals to transport between Meyrin and Prevessin • MTG for CTF3 will stay in MNR (Meyrin) AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
Layout overview AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
External conditions & events AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
CCR Racks AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
MNR Racks AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
Exchange signals AB/CO/HT - Review of Activities for PS-SPS 2006 Startup
CBCM : DELIVERABLES AB/CO/HT - Review of Activities for PS-SPS 2006 Startup