RHIC Status

RHIC Status. V.Ptitsyn. Polarized Proton Run-6 Machine Set Up. Cool-Down Mode : 2 weeks (02/01-02/13) -> completed StartUp Mode: 2 weeks (02/13-02/28) (3 shifts per day) Injection setup (02/13-02/17) -> completed Ramp development (02/17-02/23) -> completed

mbrisco
Télécharger la présentation

RHIC Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RHIC Status V.Ptitsyn

  2. Polarized Proton Run-6 Machine Set Up • Cool-Down Mode : 2 weeks (02/01-02/13) -> completed • StartUp Mode: 2 weeks (02/13-02/28) (3 shifts per day) • Injection setup (02/13-02/17) -> completed • Ramp development (02/17-02/23) -> completed 6 bunch ramps with up to 1e11 p/bunch. Rotator ramp. • Store development (02/23-02/28) -> underway 6-56 bunch ramps; up to 1.5e11 p/bunch already started • RampUp Mode: 1 week(03/01-03/07) ( Owl shift for experiment setup)111 bunch development • Physics Running (03/08- ) 02/28/06 Time Meeting V.Ptitsyn

  3. Present Status of Machine Setup • Main achievement during the last week: • 56 bunch pp28 and rotator ramps with more than 90% transmission efficiencies • 56 bunch stores for the detector setup overnight started. (Rotators off) • 111 bunch injection with 1-1.2e11 p/bunch. One successful 111 bunch ramp (including rotators) • CNI polarimeter setup continued. Polarization measurements at the store. Problems with polarimeter targets were found (especially in Yellow) • Polarization and transverse emittance dependence on the bunch intensity was measured • Development of the main store (with the rotators on) has been done and collisions steered there 02/28/06 Time Meeting V.Ptitsyn

  4. 111 bunches. First test. Worst vacuum observed in IR6 and IR8 common regions but experimental magnets were off In Blue single beam warm sections the vacuum deterioration is less than last run 02/28/06 Time Meeting V.Ptitsyn

  5. Experiment setup stores 56 bunches 0.8-0.9e11/bunch First four nights collisions at PHENIX and STAR Last night BRAHMS collisions added 02/28/06 Time Meeting V.Ptitsyn

  6. Betatron tunes with the Feedback on 02/28/06 Time Meeting V.Ptitsyn

  7. Polarization measurements Done on regular basis with 56 bunches 02/28/06 Time Meeting V.Ptitsyn

  8. Bunch intensity dependences Emittance vs intensity Polarization vs intensity Emittance error bar should be revised! 02/28/06 Time Meeting V.Ptitsyn

  9. Start of Physics running • Suggested conditions for the start of physics running: • Reproducible polarization >45% at the store. • Luminosity at 25% level of required (achievable with 56 bunches) • Acceptable background situation. • It is not improbable to achieve these conditions to the end of this week • Further increasing the luminosity may be done during the first weeks of Physics running (going to 111 bunches) 02/28/06 Time Meeting V.Ptitsyn

More Related