Status of the CTF3

Status of the CTF3. L. Rinolfi. Brief overview of activities. D605. RINGS. LINAC. Delay Loop. DL. TL1. Combiner Ring. CR. TL2. D604. CLEX. 30 GHz production. PHIN. Rings : => Polarity check in DL => Attenuator for the RF deflectors in CR => CC.MTV 0253 in TL2. CTF2:

Télécharger la présentation

Status of the CTF3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the CTF3 L. Rinolfi L. Rinolfi

  2. Brief overview of activities D605 RINGS LINAC Delay Loop DL TL1 Combiner Ring CR TL2 D604 CLEX 30 GHz production PHIN • Rings: => Polarity check in DL => Attenuator for the RF deflectors in CR => CC.MTV 0253 in TL2 • CTF2: => laser system improvements for PHIN and for CALIFES • CLEX: => TBL line => CALIFES => TBTS L. Rinolfi

  3. CALIFES - Probe Beam ITL DUM 0450 ACS 0230 ACS 0250 ACS 0270 TBTS CA.FCU 0430 CA.MTV 0420 CA.MTV 0125 (virtual cathode) CA.MTV 0215 CA.MTV 0390 CA.BPR 0370 CA.ICT 0210 CA.BPM 0410 CA.SDH 0340 CA.BPM 0240 CA.BPM 0310 CA.BPM 0220 CA.BPM 0260 CA.BPM 0380 CA.DHG/DVG 0130 CA.DHB/DVB 0250 CA.DHG/DVG 0245 CA.DHG/DVG 0225 CA.DHG/DVG 0385 CA.DHB/DVB 0230 CA.DHG/DVG 0320 CA.DHB/DVB 0290 CA.DHB/DVB 0270 CA.DHG/DVG 0265 CA.QFD 0350 CA.BHB 0400 CA.SNG 0230 CA.QFD 0360 CA.SNG 0250 CA.QDD 0355 CA.SNH 0110 CA.SNI 0120 CA.VVS 0300 CA.VVS 0200 CA.VVS 0100 CA.VVS 0500 L. Rinolfi

  4. Components installed in 2009 TL2 line TBL line Prototype Module CB.VPI 0215 CB.DHD/DVD 0140 CB.DHD/DVD 0130 CB.PET 0220 CC.QDL 0920 CC.QFL 0910 CC.WCM 0960 CB.BPS 0210 CB.QDR 0200 CB.QDM 0120 CB.QFM 0110 CC.BPM 0930 CC.BPR 0915 CB.BPM 0150 CB.VVS 0100 CM.BHL 0100 CC.MTV 0970 CC.VVS 0900 CB.VPI 0135 CCS.MTV 0980 CB.MOV 0205 CC.DHD/DVD 0940 CC.VPI 0950 CCS.VPI 0990 TL2’ line TL2 spectrometer CCS.DUM 0995 L. Rinolfi

  5. PETS in TBTS Variable phase shifter Variable splitter Drive Beam L. Rinolfi

  6. CTF3 Schedule regularly updated : http://clic-study.web.cern.ch/CLIC-Study/ L. Rinolfi

  7. A huge effort was done to upgrade CALIFES, TBL and TBTS Thanks to all team involved including CERN and external collaborators: Vacuum, magnets, survey, instrumentation, RF, cabling, power supplies, … L. Rinolfi