MT Continuum Project Overview: Enhancements for Training and Development in NETC Communities

DESCRIPTION

The MT Continuum Project focuses on re-engineering strategic systems programs to enhance training pipelines for missile technicians in the TRIDENT program. By employing a blended learning approach combining Instructor-Led Training (ILT) and Interactive Multimedia Instruction (IMI), the project aims to define business rules and data exchange mechanisms essential for effective curriculum development. The project has completed key design phases, and significant progress is being made in development, with insights gathered for other NETC communities on effective learning content design and assessment strategies.

1 / 8

Télécharger la présentation

MT Continuum Project Overview: Enhancements for Training and Development in NETC Communities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. MT Continuum Status Gerry Cullison, SSP Mark Campbell, MT Continuum Team Mike Coyle, AIM team 23 April 2013

  2. Overview • MT Continuum overview • Application to other communities • Project status • Lessons learned for other NETC communities

  3. MT Continuum Project Strategic Systems Programs (SSP) re-engineering 30+ week training pipeline for TRIDENT Ballistic Submarine (SSBN) Missile Techs (MTs) into blended just-enough/just-in-time ILE-conformant Instructor Led (ILT) and Interactive Multimedia Instruction(IMI) segments AIM CPM and LO Module toolsets part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms

  4. MT Continuum Project MT Continuum team: SSP - Requirements Owners, Afloat Delivery System Contractor team – ILT development, IMI Storyboard development, SMEs NAWCTSD / AIM team - CPM/LO Module support NUWC – LMS/CCS (Seaware) LSI, Inc. - ISD and IMI design/development Chenega Logistics – CM/QA agent for SSP SLC (NETC CCA for MT curriculum) Fleet – SMEs

  5. Application to Other Communities Based on NETC-mandated JDTA as fleet performance requirement basis for learning content design and development (NAVEDTRA 137) Closely coordinated with NAVEDTRA 136 development Hands-on production phase development of complete LO Module ILT lessons/sections and design of IMI lessons/sections as well as definition of new JDTA/LO Module versioning concepts Integrated development and maintenance environment for blended, SCORM NAVEDTRA 136-compliant learning content Bi-directional interface between LO Module and GFI CBT toolset for integrated ILT/IMI development/maintenance

  6. Project Status • Plan, Analyze & Design Phases Completed • Delivery Method Analysis Process still needed • Scientific/Justifiable/Repeatable • Development fully underway. Development effort is at the halfway point. • Assessment, Performance Testing (NAVEDTRA 132) • Large emphases on Implementation, Evaluation and Maintenance. • Versioning, LMS interface.

  7. Lessons learned for other NETC communities • JDTA • Foundation. Getting this right cannot be overemphasized. • Maturity of Design Documents and Processes • IMDP, Learning Objectives (ISD Considerations), Process Documents, Assessment Design, Time to Train Estimations, Delivery Method Analysis

  8. Questions?