Completion of ECN3 Crane Renovation and Upcoming NA62 Field Mapping Plans

The ECN3 crane renovation has successfully concluded, highlighted by a reception test conducted on January 25th and a final approval received last week. NA62 aims to execute a field mapping of the MNP33 magnet within 2013, targeting late September to October for optimal conditions regarding power and cooling requirements. Additionally, there will be a necessary evaluation of the front-end alignment, alongside a 180-degree rotation of the 4th MTR and consolidation of T10. Detailed installation planning for ECN3 is ongoing.

nedra
Télécharger la présentation

Completion of ECN3 Crane Renovation and Upcoming NA62 Field Mapping Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lau Gatignon, 19 February 2013 EATM Contribution - NA62

  2. K12 / ECN3 • The ECN3 crane renovation has been completed with a reception test on the 25th of January and a second final approval last week. • NA62 wants to perform a field map of the MNP33 magnet in the course of 2013, the preferred period being around September/OctoberIs this possible (power, cooling?) • At some stage the front end alignment needs to be checked, the 4th MTR turned by 180o and T10 to be consolidated.

  3. ECN3 Installation planning (1)

  4. ECN3 installation planning (2)